[Site Map] [Contact] [Home]
STEREO SCIENCE CENTER

Important notice about reduced STEREO science operations

STEREO Coordinated Observations Calendar

Archived plans: 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014

Below, please find the current plans for STEREO operations. All dates and times are UTC unless otherwise specified. More detailed plans can be found in the weekly schedules (Ahead, Behind). Other planning resources are also provided. This page is also available as plain text.

Contact information for coordinated observation requests can be found on the Solar JOP guidelines page.

Links to planning and scheduling pages for other missions: SOHO, TRACE, Hinode, Ulysses, NSO, VLA, EISCAT, Max Millenium, Sounding Rockets, ISTP Planning, Mees current/ next month.

-------------------------------------------------------------------------------
Scheduled activities for Week 31:

M Jul 28 (209)  Behind:	Momentum dump, 19:45 UT
T Jul 29 (210)  Behind: COR1,COR2 doors closed due to scheduling error
W Jul 30 (211)  Behind: Project interface test with new 34 meter station D35
T Jul 31 (212)  
F Aug 01 (213)  
S Aug 02 (214)  
S Aug 03 (215)  Behind: Operational HGA Side Lobe Test

-------------------------------------------------------------------------------
Scheduled activities for Week 32:

M Aug 04 (216)  Ahead:	Momentum dump, 18:00 UT
T Aug 05 (217)  
W Aug 06 (218)  Ahead:	Test of side lobe telemetry rates, 16:30 UT
T Aug 07 (219)  
F Aug 08 (220)  
S Aug 09 (221)  
S Aug 10 (222)  

-------------------------------------------------------------------------------
Scheduled activities for Week 33:

M Aug 11 (223)  
T Aug 12 (224)  
W Aug 13 (225)  
T Aug 14 (226)  Ahead:	Solar Conjunction Readiness Review
		Ahead:	Battery conditioning
F Aug 15 (227)  
S Aug 16 (228)  Ahead:	SECCHI stepped calibration roll, 17:50 UT (aphelion)
S Aug 17 (229)  

-------------------------------------------------------------------------------
Scheduled activities for Week 34:

M Aug 18 (230)  
T Aug 19 (231)  Ahead:	SSR reconfiguration
W Aug 20 (232)  Ahead:	HGA on 1st side lobe
T Aug 21 (233)  
F Aug 22 (234)  
S Aug 23 (235)  
S Aug 24 (236)  

-------------------------------------------------------------------------------
Scheduled activities for Week 35:

M Aug 25 (237)  Ahead:	Test with 34 meter at 633 bps
		Behind: Momentum dump,  18:30 UT
T Aug 26 (238)  
W Aug 27 (239)  
T Aug 28 (240)  
F Aug 29 (241)  
S Aug 30 (242)  
S Aug 31 (243)  

Notes:

* Ahead operating on first side lobe.

-------------------------------------------------------------------------------
Scheduled activities for Week 36:

M Sep 01 (244)  
T Sep 02 (245)  
W Sep 03 (246)  
T Sep 04 (247)  
F Sep 05 (248)  
S Sep 06 (249)  
S Sep 07 (250)  

Notes:

* Ahead operating on first side lobe.

* Passage of Comet Siding Spring through HI2 on Behind, Sep 07-Nov 15

-------------------------------------------------------------------------------
Scheduled activities for Week 37:

M Sep 08 (251)  
T Sep 09 (252)  
W Sep 10 (253)  
T Sep 11 (254)  
F Sep 12 (255)  
S Sep 13 (256)  
S Sep 14 (257)  

Notes:

* Ahead operating on first side lobe.

* Passage of Comet Siding Spring through HI2 on Behind, Sep 07-Nov 15

-------------------------------------------------------------------------------


Upcoming events:

2014:

* Sep 07-Nov 15		Behind:	Passage of Comet Siding Spring through HI2-B
* Sep 21		MAVEN arrival at Mars
* Sep 29-Oct 6		Behind:	Test of solar conjunction operations
* Oct 17		Behind:	Comet Siding Spring encounter with Mars
* Oct 23		Both:	Solar Conjunction Readiness Review
* Nov 10		Ahead:	HGA on 2nd side lobe
* Nov 17		Ahead:	Test with 34 meter at 633 bps
* Nov 19		Behind: HGA hits soft stop
* Nov 28		Behind:	SSR reconfiguration
* Dec 1			Behind:	HGA on 1st side lobe
* Dec 8			Behind:	Test with 34 meter at 633 bps

2015:

* Jan 6			Behind:	HGA on 2nd side lobe
* Jan 12		Behind:	Test with 34 meter at 633 bps
* Jan 20		Behind:	Instrument power down
* Jan 22 - Mar 23	Behind:	Spacecraft behind Sun
* Mar			DAWN - Ceres arrival
* Mar 22		Ahead:	Instrument power down
* Mar 23 - Apr 06	Behind:	S/C SSR Playback at 3 kbps
* Mar 24 - Jul 07	Ahead:	Spacecraft behind Sun
* Mar 30		Behind: Instrument power on
* Apr 25		Behind:	HGA on 1st side lobe
* Jul			DAWN - End of nominal mission
* Jul 8			Behind:	HGA on 2nd side lobe
* Jul 7-28		Ahead:	S/C SSR Playback at 3 kbps
* Jul 14		Ahead:	Instrument power on
* Sep 24		Ahead:	HGA on 1st side lobe
* Nov 20		Behind:	HGA on 1st side lobe
* Dec 29		Ahead:	HGA on main lobe, offpoint 1 degree
			Ahead:	SSR playback and reconfiguration, S/C checkout
* Dec 31		Ahead:	Instrument recommissioning

2016:

* Jan 2			Behind:	HGA on main lobe
			Behind:	SSR playback and reconfiguration, S/C checkout
* Jan 5			Behind:	Instrument recommissioning
* Jan 27		Both:	HGA calibration
* Feb 19		Ahead:	HGA on main lobe
* Mar 16		Both:	Post Solar Conjunction Assessment Review
* Jul 5			Juno arrival at Jupiter

2017:

* Jul 11		Ahead:	Switch downlink rate to 160 kbps
* Jul 22		Behind:	Switch downlink rate to 160 kbps

2018:

* Mar 5			Ahead:	Mercury transit

 

Plans last modified Tuesday, 29-Jul-2014 15:57:30 EDT


Last Revised: Tuesday, 07-Jan-2014 15:29:18 EST
Responsible NASA Official: [email address: Joseph.B.Gurman<at>nasa<dot>gov]
Privacy Policy and Important Notices
Feedback and comments: webmaster