------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 02 (306) T Nov 03 (307) Behind: Momentum dump, 16:00 UT W Nov 04 (308) T Nov 05 (309) F Nov 06 (310) S Nov 07 (311) S Nov 08 (312) ------------------------------------------------------------------------------- Scheduled activities for Week 46: M Nov 09 (313) T Nov 10 (314) W Nov 11 (315) T Nov 12 (316) F Nov 13 (317) S Nov 14 (318) S Nov 15 (319) ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 16 (320) T Nov 17 (321) W Nov 18 (322) T Nov 19 (323) F Nov 20 (324) S Nov 21 (325) S Nov 22 (326) ------------------------------------------------------------------------------- Scheduled activities for Week 48: M Nov 23 (327) T Nov 24 (328) Ahead: SECCHI stepped calibration roll W Nov 25 (329) T Nov 26 (330) Thanksgiving F Nov 27 (331) S Nov 28 (332) S Nov 29 (333) ------------------------------------------------------------------------------- Upcoming events: 2009: ICAL-001: Oct 12-16, Dec 14-18 SECCHI Stepped calibration rolls Ahead: Nov 24 Behind: Dec 22 * Mar 16-Sep LASCO C2pB for Tomography Reconstruction * Mar 27-... JOP 222, Origin of SEPS, Target of opportunity * Nov 30 Behind: Begin 7 hour daily DSN tracks * Dec 7 Behind: Switch downlink rate to 240 kbps 2010: SECCHI Stepped calibration rolls Ahead: Feb 23, May 18, Aug 10, Nov 2 Behind: Apr 6, Jul 13, Oct 12 * Jan 6 Both: HGA calibration * Jan 7,15 EIT shutterless (TBC) * Spring (TBD) SUMI sounding rocket launch http://adsabs.harvard.edu/abs/2008AGUSMSP51B..01A * Apr 8,15 EIT shutterless (TBC) * Apr 19 Ahead: Begin 7 hour daily DSN tracks * Apr 26 Ahead: Switch downlink rate to 240 kbps * Jul 8,15 EIT shutterless (TBC) * Jul 11 Total solar eclipse http://eclipse.gsfc.nasa.gov/SEmono/TSE2010/TSE2010.html * Jul 14 Both: HGA calibration * Sep 7 Both: Begin 8 hour daily DSN tracks * Sep 13 Both: Switch downlink rate to 160 kbps * Nov 15 Behind: Switch downlink rate to 120 kbps 2011: * Jan 12 Both: HGA calibration * Feb 6 STEREO spacecraft at 180 degree separation * Mar 18 Messenger - Mercury orbital insertion * Apr 11 Ahead: Switch downlink rate to 120 kbps * Jul 13 Both: HGA calibration * Aug DAWN - Vesta arrival * Sep 19 Behind: Switch downlink rate to 96 kbps * Sep 26 Ahead: Switch downlink rate to 96 kbps 2012: * Jan 11 Both: HGA calibration * May DAWN - Vesta departure * Jul 11 Both: HGA calibration * Aug Both: Switch downlink rate to 30 kbps * Nov 13 Total solar eclipse, south Pacific 2013: * Dec 12 Ahead: Possible Mercury transit (TBC) 2014: * Apr 29 Behind: Possible Mercury transit (TBC) 2015: * Feb DAWN - Ceres arrival * Jan 10 - Apr 12 Behind: Spacecraft behind Sun * Feb 17 - Aug 2 Ahead: Spacecraft behind Sun * Jul 23 - Nov 10 Behind: Spacecraft behind Sun * Jul DAWN - End of nominal mission