Scheduled activities for Week 01:

M Jan 03 (003)  
T Jan 04 (004)  
W Jan 05 (005)  
T Jan 06 (006)  
F Jan 07 (007)  
S Jan 08 (008)  Behind: IMPACT/PLASTIC IDPU shut down due to high current
S Jan 09 (009)  

-------------------------------------------------------------------------------
Scheduled activities for Week 02:

M Jan 10 (010)  
		Behind: Start of recovery operations for IMPACT/PLASTIC
T Jan 11 (011)  Ahead:  SECCHI watchdog reset, 00:16-14:10 UT
W Jan 12 (012)  Behind: HGA calibration, 16:00 UT
T Jan 13 (013)  Ahead:  HGA calibration, 16:00 UT
F Jan 14 (014)  
S Jan 15 (015)  
S Jan 16 (016)  

Notes:

* IMPACT/PLASTIC recovery operations on Behind will continue during the week.

-------------------------------------------------------------------------------
Scheduled activities for Week 03:

M Jan 17 (017)  
T Jan 18 (018)  
W Jan 19 (019)  Ahead:  Momentum dump, 20:00 UT
T Jan 20 (020)  
F Jan 21 (021)  
S Jan 22 (022)  
S Jan 23 (023)  

-------------------------------------------------------------------------------
Scheduled activities for Week 04:

M Jan 24 (024)  
T Jan 25 (025)  
W Jan 26 (026)  
T Jan 27 (027)  Behind: Momentum dump, 19:00 UT
F Jan 28 (028)  
S Jan 29 (029)  
S Jan 30 (030)  

-------------------------------------------------------------------------------
Scheduled activities for Week 05:

M Jan 31 (031)  
T Feb 01 (032)  Ahead:  SECCHI stepped calibration roll, 13:15 UT
W Feb 02 (033)  
T Feb 03 (034)  
F Feb 04 (035)  
S Feb 05 (036)  
S Feb 06 (037)  STEREO spacecraft at 180 degree separation

-------------------------------------------------------------------------------
Scheduled activities for Week 06:

M Feb 07 (038)  
T Feb 08 (039)  Behind: SECCHI stepped calibration roll, 9:45 UT
W Feb 09 (040)  
T Feb 10 (041)  
F Feb 11 (042)  
S Feb 12 (043)  
S Feb 13 (044)  

-------------------------------------------------------------------------------
Scheduled activities for Week 07:

M Feb 14 (045)  
T Feb 15 (046)  
W Feb 16 (047)  
T Feb 17 (048)  
F Feb 18 (049)  
S Feb 19 (050)  
S Feb 20 (051)  

-------------------------------------------------------------------------------
Scheduled activities for Week 08:

M Feb 21 (052)  
T Feb 22 (053)  
W Feb 23 (054)  
T Feb 24 (055)  
F Feb 25 (056)  
S Feb 26 (057)  
S Feb 27 (058)  

-------------------------------------------------------------------------------
Scheduled activities for Week 09:

M Feb 28 (059)  
T Mar 01 (060)  
W Mar 02 (061)  
T Mar 03 (062)  
F Mar 04 (063)  
S Mar 05 (064)  
S Mar 06 (065)  

-------------------------------------------------------------------------------
Scheduled activities for Week 10:

M Mar 07 (066)  
T Mar 08 (067)  Ahead:  Momentum dump, 16:00 UT
W Mar 09 (068)  
T Mar 10 (069)  Behind: Momentum dump, 19:45 UT
		Behind: SECCHI COR1 and COR2 doors remain closed after dump
F Mar 11 (070)  Ahead:  Return-to-service track on station 15, shadowed by 26
		Behind: SECCHI COR1 and COR2 doors opened ~18:50 UT
S Mar 12 (071)  
S Mar 13 (072)  Start of daylight savings time in US

-------------------------------------------------------------------------------
Scheduled activities for Week 11:

M Mar 14 (073)  
T Mar 15 (074)  
W Mar 16 (075)  
T Mar 17 (076)  
F Mar 18 (077)  Messenger - Mercury orbital insertion
S Mar 19 (078)  
S Mar 20 (079)  

-------------------------------------------------------------------------------
Scheduled activities for Week 12:

M Mar 21 (080)  
T Mar 22 (081)  Ahead:  SECCHI stepped calibration roll, 9:15 UT
W Mar 23 (082)  
T Mar 24 (083)  
F Mar 25 (084)  
S Mar 26 (085)  
S Mar 27 (086)  

-------------------------------------------------------------------------------
Scheduled activities for Week 13:

M Mar 28 (087)  
T Mar 29 (088)  
W Mar 30 (089)  
T Mar 31 (090)  
F Apr 01 (091)  
S Apr 02 (092)  
S Apr 03 (093)  

-------------------------------------------------------------------------------
Scheduled activities for Week 14:

M Apr 04 (094)  
T Apr 05 (095)  Ahead:  SECCHI stepped calibration roll, 9:00 UT
		Ahead:  Cosmic ray scrub disabled on HI1-A for test, 20-24 UT
W Apr 06 (096)  
T Apr 07 (097)  
F Apr 08 (098)  
S Apr 09 (099)  
S Apr 10 (100)  

-------------------------------------------------------------------------------
Scheduled activities for Week 15:

M Apr 11 (101)  
T Apr 12 (102)  
W Apr 13 (103)  Ahead:  SLE testing 15-20 UT
T Apr 14 (104)  
F Apr 15 (105)  
S Apr 16 (106)  
S Apr 17 (107)  

-------------------------------------------------------------------------------
Scheduled activities for Week 16:

M Apr 18 (108)  
T Apr 19 (109)  Ahead:  Test track on station 24, shadowing 25
W Apr 20 (110)  Ahead:  Momentum dump, 21:00 UT
		Behind: Momentum dump, 18:00 UT
T Apr 21 (111)  
F Apr 22 (112)  Both: SFG swap-over, 18:10 UT
S Apr 23 (113)  
S Apr 24 (114)  

-------------------------------------------------------------------------------
Scheduled activities for Week 17:

M Apr 25 (115)  
T Apr 26 (116)  
W Apr 27 (117)  
T Apr 28 (118)  
F Apr 29 (119)  Behind: Return-to-service track on D63, shadowing D65
S Apr 30 (120)  
S May 01 (121)  

-------------------------------------------------------------------------------
Scheduled activities for Week 18:

M May 02 (122)  
T May 03 (123)  Ahead:  SECCHI calibration roll, 08:20 UT
		Behind: SECCHI calibration roll, 14:15 UT
		Behind: SLE test, 14-18 UT
W May 04 (124)  Behind: SECCHI watchdog reset 16:15-19:49 UTb
T May 05 (125)  Behind: APCA hardware test using station D24, shadowing D15
F May 06 (126)  Behind: Return-to-service track on D24, shadowed by D15
S May 07 (127)  
S May 08 (128)  

-------------------------------------------------------------------------------
Scheduled activities for Week 19:

M May 09 (129)  Ahead:  Return-to-service track on station D24
T May 10 (130)  
W May 11 (131)  
T May 12 (132)  
F May 13 (133)  
S May 14 (134)  
S May 15 (135)  

Notes:

* Interference pattern appears on EUVI,COR1,COR2 images from Behind starting
  around 17:20 UT on May 9.  Fixed on May 12.

-------------------------------------------------------------------------------
Scheduled activities for Week 20:

M May 16 (136)  
T May 17 (137)  
W May 18 (138)  Behind: SLE testing on station 63, shadowing 55
T May 19 (139)  
F May 20 (140)  
S May 21 (141)  
S May 22 (142)  

-------------------------------------------------------------------------------
Scheduled activities for Week 21:

M May 23 (143)  
T May 24 (144)  Behind: Test of 360 kbps 5-8 UTC using ESA New Norcia station
W May 25 (145)  
T May 26 (146)  
F May 27 (147)  
S May 28 (148)  
S May 29 (149)  

Notes:

* No beacon broadcast during New Norcia test

-------------------------------------------------------------------------------
Scheduled activities for Week 22:

M May 30 (150)  Memorial Day
		Ahead:  SECCHI watchdog reset, 3:41-15:35 UT
T May 31 (151)  Behind: Momentum dump, 16:00 UT
W Jun 01 (152)  Ahead:  Momentum dump, 14:30 UT
T Jun 02 (153)  
F Jun 03 (154)  
S Jun 04 (155)  
S Jun 05 (156)  

Notes:

* Changing to 8 hours/day of downlink on both spacecraft in preparation for
  switching to 160 kbps downlink rate in late June, early July.

* IMPACT LET software anomaly starting May 31 on Behind, Jun 4 on Ahead

-------------------------------------------------------------------------------
Scheduled activities for Week 23:

M Jun 06 (157)  
T Jun 07 (158)  
W Jun 08 (159)  Ahead:  IMPACT/LET recovered
T Jun 09 (160)  Behind: IMPACT/LET recovered
F Jun 10 (161)  
S Jun 11 (162)  
S Jun 12 (163)  

-------------------------------------------------------------------------------
Scheduled activities for Week 24:

M Jun 13 (164)  
T Jun 14 (165)  Ahead:  Return-to-service track on station 34
W Jun 15 (166)  Ahead:  Test of 160 kbps on station 25
T Jun 16 (167)  
F Jun 17 (168)  
S Jun 18 (169)  
S Jun 19 (170)  

-------------------------------------------------------------------------------
Scheduled activities for Week 25:

M Jun 20 (171)  
T Jun 21 (172)  
W Jun 22 (173)  
T Jun 23 (174)  
F Jun 24 (175)  
S Jun 25 (176)  
S Jun 26 (177)  

-------------------------------------------------------------------------------
Scheduled activities for Week 26:

M Jun 27 (178)  Ahead: Switch downlink rate to 160 kbps, 480 kbps for 70 m
T Jun 28 (179)  
W Jun 29 (180)  
T Jun 30 (181)  
F Jul 01 (182)  
S Jul 02 (183)  
S Jul 03 (184)  

-------------------------------------------------------------------------------
Scheduled activities for Week 27:

M Jul 04 (185)  Independence day
T Jul 05 (186)  
W Jul 06 (187)  
T Jul 07 (188)  
F Jul 08 (189)  
S Jul 09 (190)  
S Jul 10 (191)  

-------------------------------------------------------------------------------
Scheduled activities for Week 28:

M Jul 11 (192)  
T Jul 12 (193)  Behind: Momentum dump, 19:30 UT
W Jul 13 (194)  Behind: Switch downlink rate to 160 kbps, 480 kbps for 70 m
		HGA calibration, Ahead: 15:00 UT, Behind: 16:00 UT
T Jul 14 (195)  Ahead:  Momentum dump, 15:00 UT
F Jul 15 (196)  
S Jul 16 (197)  
S Jul 17 (198)  

Notes:

* Dawn expected to achieve orbit about Vesta around Jul 16.

-------------------------------------------------------------------------------
Scheduled activities for Week 29:

M Jul 18 (199)  Behind: Test 06:25-06:50 with ESA New Norcia station
T Jul 19 (200)  
W Jul 20 (201)  
T Jul 21 (202)  
F Jul 22 (203)  Behind: Test of 135 degree roll for comet Elenin, 12-14 UT
S Jul 23 (204)  
S Jul 24 (205)  

-------------------------------------------------------------------------------
Scheduled activities for Week 30:

M Jul 25 (206)  
T Jul 26 (207)  Ahead:	SECCHI stepped calibration roll, 7:15 UT
		Behind: SECCHI stepped calibration roll, 9:00 UT
W Jul 27 (208)  
T Jul 28 (209)  
F Jul 29 (210)  
S Jul 30 (211)  
S Jul 31 (212)  

-------------------------------------------------------------------------------
Scheduled activities for Week 31:

M Aug 01 (213)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
T Aug 02 (214)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
W Aug 03 (215)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
T Aug 04 (216)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
F Aug 05 (217)  Behind: 135 degree roll to observe comet Elenin, 10-12 UT
S Aug 06 (218)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
S Aug 07 (219)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT

Notes

* Aug 1-12		Behind: Spacecraft rolls to observe comet Elenin

-------------------------------------------------------------------------------
Scheduled activities for Week 32:

M Aug 08 (220)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
T Aug 09 (221)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
W Aug 10 (222)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
T Aug 11 (223)  Behind: 135 degree roll to observe comet Elenin, 8-10 UT
F Aug 12 (224)  Behind: 135 degree roll to observe comet Elenin, 10-12 UT
S Aug 13 (225)  
S Aug 14 (226)  

Notes

* Aug 1-12		Behind: Spacecraft rolls to observe comet Elenin

-------------------------------------------------------------------------------
Scheduled activities for Week 33:

M Aug 15 (227)  
T Aug 16 (228)  
W Aug 17 (229)  
T Aug 18 (230)  
F Aug 19 (231)  
S Aug 20 (232)  
S Aug 21 (233)  Ahead:  SECCHI watchdog reset, 23:47:24 UT

-------------------------------------------------------------------------------
Scheduled activities for Week 34:

M Aug 22 (234)  Ahead:  Recovery from SECCHI watchdog reset, 13:00 UT
T Aug 23 (235)  
W Aug 24 (236)  Behind: Momentum dump, 18:00 UT
T Aug 25 (237)  Ahead:  Momentum dump, 12:30
F Aug 26 (238)  
S Aug 27 (239)  
S Aug 28 (240)  

-------------------------------------------------------------------------------
Scheduled activities for Week 35:

M Aug 29 (241)  
T Aug 30 (242)  
W Aug 31 (243)  
T Sep 01 (244)  
F Sep 02 (245)  
S Sep 03 (246)  
S Sep 04 (247)  

Notes:

* Test of increasing the telemetry rate when the spacecraft elevation is above
  25 degrees on Behind on Aug 29.

-------------------------------------------------------------------------------
Scheduled activities for Week 36:

M Sep 05 (248)  
T Sep 06 (249)  
W Sep 07 (250)  
T Sep 08 (251)  
F Sep 09 (252)  
S Sep 10 (253)  
S Sep 11 (254)  

-------------------------------------------------------------------------------
Scheduled activities for Week 37:

M Sep 12 (255)  
T Sep 13 (256)  
W Sep 14 (257)  
T Sep 15 (258)  
F Sep 16 (259)  
S Sep 17 (260)  
S Sep 18 (261)  

-------------------------------------------------------------------------------
Scheduled activities for Week 38:

M Sep 19 (262)  Ahead: IMPACT/PLASTIC autonomous power down, 15:43 UT
T Sep 20 (263)  
W Sep 21 (264)  
T Sep 22 (265)  
F Sep 23 (266)  
S Sep 24 (267)  
S Sep 25 (268)  

Notes:

* IMPACT/PLASTIC recovery on Ahead following autonomous power down

-------------------------------------------------------------------------------
Scheduled activities for Week 39:

M Sep 26 (269)  
T Sep 27 (270)  
W Sep 28 (271)  
T Sep 29 (272)  
F Sep 30 (273)  
S Oct 01 (274)  
S Oct 02 (275)  

-------------------------------------------------------------------------------
Scheduled activities for Week 40:

M Oct 03 (276)  
T Oct 04 (277)  Momentum dumps, Ahead: 13:30, Behind: 15:00
W Oct 05 (278)  
T Oct 06 (279)  
F Oct 07 (280)  
S Oct 08 (281)  
S Oct 09 (282)  

-------------------------------------------------------------------------------
Scheduled activities for Week 41:

M Oct 10 (283)  
T Oct 11 (284)  
W Oct 12 (285)  
T Oct 13 (286)  Ahead:  Beacon test using Turbo decoding, 7:25-12:05 UT
F Oct 14 (287)  
S Oct 15 (288)  
S Oct 16 (289)  

-------------------------------------------------------------------------------
Scheduled activities for Week 42:

M Oct 17 (290)  
T Oct 18 (291)  
W Oct 19 (292)  
T Oct 20 (293)  
F Oct 21 (294)  
S Oct 22 (295)  
S Oct 23 (296)  

-------------------------------------------------------------------------------
Scheduled activities for Week 43:

M Oct 24 (297)  
T Oct 25 (298)  
W Oct 26 (299)  Ahead: SECCHI stepped calibration roll, 8:25 UT
T Oct 27 (300)  
F Oct 28 (301)  
S Oct 29 (302)  
S Oct 30 (303)  

-------------------------------------------------------------------------------
Scheduled activities for Week 44:

M Oct 31 (304)  
T Nov 01 (305)  
W Nov 02 (306)  
T Nov 03 (307)  
F Nov 04 (308)  
S Nov 05 (309)  
S Nov 06 (310)  Daylight savings time ends in USA

Notes:

* Behind test with ESA reference station Nov 1, 14-17 UT, using simulated data

-------------------------------------------------------------------------------
Scheduled activities for Week 45:

M Nov 07 (311)  
T Nov 08 (312)  Behind: SECCHI stepped calibration roll, 9:25 UT
W Nov 09 (313)  
T Nov 10 (314)  
F Nov 11 (315)  
S Nov 12 (316)  
S Nov 13 (317)  

-------------------------------------------------------------------------------
Scheduled activities for Week 46:

M Nov 14 (318)  
T Nov 15 (319)  Ahead:  Momentum dump, 16:30 UT
W Nov 16 (320)  Behind: Momentum dump, 22:00 UT
T Nov 17 (321)  Ahead:  SECCHI watchdog reset, 19:02 UT
F Nov 18 (322)  Ahead:  SECCHI recovery from watchdog reset, 12 UT
S Nov 19 (323)  
S Nov 20 (324)  

Notes:

* Behind test with DSS 15, Nov. 16 14:15-16:15 UT, using simulated data

-------------------------------------------------------------------------------
Scheduled activities for Week 47:

M Nov 21 (325)  
T Nov 22 (326)  
W Nov 23 (327)  Ahead:  SECCHI watchdog reset, 5:27 UT, recovered 16 UT
T Nov 24 (328)  Thanksgiving
F Nov 25 (329)  
S Nov 26 (330)  
S Nov 27 (331)  

Notes:

* Both Thursday and Friday, Nov 24-25, are holidays at APL.

-------------------------------------------------------------------------------
Scheduled activities for Week 48:

M Nov 28 (332)  
T Nov 29 (333)  Ahead:	SECCHI stepped calibration roll, 09:00 UT
W Nov 30 (334)  
T Dec 01 (335)  
F Dec 02 (336)  
S Dec 03 (337)  
S Dec 04 (338)  

-------------------------------------------------------------------------------
Scheduled activities for Week 49:

M Dec 05 (339)  
T Dec 06 (340)  
W Dec 07 (341)  
T Dec 08 (342)  
F Dec 09 (343)  
S Dec 10 (344)  
S Dec 11 (345)  

Notes:

* Ahead test with ESA reference station Dec 6, 15-17 UT, using simulated data

-------------------------------------------------------------------------------
Scheduled activities for Week 50:

M Dec 12 (346)  
T Dec 13 (347)  
W Dec 14 (348)  
T Dec 15 (349)  
F Dec 16 (350)  
S Dec 17 (351)  
S Dec 18 (352)  

Notes:

* Special SECCHI observations for Comet Lovejoy, Dec 15-16.

-------------------------------------------------------------------------------
Scheduled activities for Week 51:

M Dec 19 (353)  Behind: Momentum dump, 16:00 UT
T Dec 20 (354)  Ahead:  Momentum dump, 17:00 UT
		Ahead:  Test track with New Norcia (D32) at 00:45 UT
		Behind: Test track with Cebreros (D62) at 19:10 UT
W Dec 21 (355)  Ahead:  Test track with Cebreros (D62) at 05:35 UT
		Behind: Test track with New Norcia (D32) at 03:30 UT
T Dec 22 (356)  
F Dec 23 (357)  
S Dec 24 (358)  
S Dec 25 (359)  

-------------------------------------------------------------------------------
Scheduled activities for Week 52:

M Dec 26 (360)  
T Dec 27 (361)  
W Dec 28 (362)  
T Dec 29 (363)  
F Dec 30 (364)  
S Dec 31 (365)  
S Jan 01 (001)  

-------------------------------------------------------------------------------

 

Plans last modified Tuesday, 06-Mar-2012 17:11:00 UTC


Last Revised: Tuesday, 11-Jan-2011 19:45:25 UTC
Responsible NASA Official: [email address: Therese.A.Kucera<at>nasa<dot>gov]
Accessibility
Privacy Policy and Important Notices
Feedback and comments: webmaster