STEREO Weekly Meeting Minutes for 2026-11-03 (Week 45) ANNOUNCEMENTS ------------- * None INSTRUMENT and SPACECRAFT STATUS -------------------------------- * Ahead is operating nominally. * PLASTIC is currently ramping up its voltage to resume operations. * After the initial loss of communications with the Behind observatory in September of 2014, NASA stopped periodic recovery operations with the last support on October 17, 2018. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 44 (Oct 26 - Nov 1) * On day 301 (Oct 28), during the DSS-56 support, the transmitter was declared red, due to a hardware problem. This anomaly resulted in the loss of 1.4 hours of real-time commanding and 2-way tracking data. See DR #M119583 for more information. * On day 301 (Oct 28), the IMPACT IDPU and SWEA were power cycled at 1455 UT to correct the Magnetometer (MAG) instrument telemetry data problem with the IDPU (Data Processing Unit). The IMPACT team confirmed the MAG was back online with the IDPU and reconfigured the IDPU/MAG and SWEA instruments for operations. The PLASTIC team confirmed their instrument was online, but the high voltages were shut off. They reconfigured their science telemetry output for operations. * On day 303 (Oct 30), during the DSS-23 support, the antenna was declared red, due to an ASD hardware problem. This anomaly resulted in the loss of 5.2 hours of real-time telemetry, commanding, tracking, and SSR data. * On day 303 (Oct 30), during the DSS-34 support, turbo decoder lock was lost intermittently between 0149 UT and 0235 UT, due to weather. This anomaly resulted in the loss of 36941 frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all the affected data. See DR #C119605 for more information. * On day 303 (Oct 30), the 81st SECCHI stepped calibration was executed at 0445 UT for midpoint in the Ahead orbit. This was the 50th SECCHI stepped calibration roll conducted without gyro use. * On day 303 thru 305 (Oct 30 – Nov 1), the PLASTIC team performed real-time commanding to ramp up high voltages following the IMPACT IDPU/SWEA power cycle. The high voltages are holding steady and PLASTIC will be ramping up again when sufficiently long passes are available. * On day 305 (Nov 1), during the DSS-53 support, turbo decoder lock was lost intermittently between 0727 UT and 0736 UT. This anomaly resulted in the loss of 524 frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all the affected data. * The average daily science data return for Ahead was 6.9 Gbits during this week. Week 45 (Nov 2-8) * Ahead has twelve tracks during the week, three at 720 kbps, and nine at 480 kbps. * There is a DSN network maintenance event scheduled for Tuesday, November 3rd, from 00:00-04:00 UT. * Tuesday DSS-23 had an antenna pointing control assembly problem so that only the last half hour of the track was used. * The 21st battery discharge event will now take place on Wednesday, November 4th, at 12:15 UT. Week 46 (Nov 9-15) * Ahead has eleven tracks during the week, three at 720 kbps, and eight at 480 kbps. * APL will be closed on Wednesday, November 11 for the Veterans Day holiday. Week 47 (Nov 16-22) * Ahead has twelve tracks during the week, three at 720 kbps, and nine at 480 kbps. * On Tuesday, November 17th, there will be a DSN Emergency Control Center (ECC) test track on station 36, from 19:25 to 21:25 UT. There will be no SSR playback or instrument commanding during this track. * The 190th momentum dump is scheduled for Friday, November 20th, at 14:00 UT. Week 48 (Nov 23-29) * Ahead has thirteen tracks during the week, all thirteen at 480 kbps. * APL will be closed November 26th and 27th for the Thanksgiving holiday. * Beginning Saturday, November 28th, SECCHI will be conducting special observations in conjunction with the Parker Solar Probe perihelion. Week 49 (Nov 30- Dec 6) * Ahead has thirteen tracks one at 720 kbps and twelve at 480 kbps. Week 50 (Dec 7 - Dec 13) * Ahead has eleven tracks, all at 480 kbps. Other COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 43: M Oct 19 (292) T Oct 20 (293) W Oct 21 (294) T Oct 22 (295) F Oct 23 (296) S Oct 24 (297) S Oct 25 (298) ------------------------------------------------------------------------------- Scheduled activities for Week 44: M Oct 26 (299) STEREO 20th Launch Anniversary T Oct 27 (300) W Oct 28 (301) T Oct 29 (302) F Oct 30 (303) Ahead: SECCHI stepped calibration roll, 04:45 UT S Oct 31 (304) S Nov 01 (305) ------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 02 (306) T Nov 03 (307) W Nov 04 (308) T Nov 05 (309) F Nov 06 (310) S Nov 07 (311) S Nov 08 (312) ------------------------------------------------------------------------------- Scheduled activities for Week 46: M Nov 09 (313) T Nov 10 (314) W Nov 11 (315) Veterans Day T Nov 12 (316) F Nov 13 (317) S Nov 14 (318) S Nov 15 (319) ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 16 (320) T Nov 17 (321) W Nov 18 (322) T Nov 19 (323) F Nov 20 (324) Ahead: Momentum dump, 14:00 UT S Nov 21 (325) S Nov 22 (326) ------------------------------------------------------------------------------- Scheduled activities for Week 48: M Nov 23 (327) T Nov 24 (328) W Nov 25 (329) T Nov 26 (330) Thanksgiving Day F Nov 27 (331) S Nov 28 (332) Start of PSP perihelion pass S Nov 29 (333) ------------------------------------------------------------------------------- Scheduled activities for Week 49: M Nov 30 (334) T Dec 1 (335) W Dec 2 (336) T Dec 3 (337) F Dec 4 (338) S Dec 5 (339) S Dec 6 (340) End of PSP perihelion pass ------------------------------------------------------------------------------- Scheduled activities for Week 50: M Dec 7 (341) T Dec 8 (342) W Dec 9 (343) T Dec 10 (344) F Dec 11 (345) S Dec 12 (346) S Dec 13 (347) ------------------------------------------------------------------------------- Upcoming events: 2026: * Nov 28-Dec 6 Parker Solar Probe perihelion pass * Dec 24 Solar Orbiter Venus flyby 2027: * Feb 25-Mar 4 Parker Solar Probe perihelion pass * Feb 8 Solar Orbiter Perihelion * May 24-31 Parker Solar Probe perihelion pass * July 7 Solar Orbiter Perihelion * Aug 21-28 Parer Solar Probe perihelion pass * Nov 17-24 Parker Solar Probe perihelion pass * Dec 4 Solar Orbiter Perihelion 2028: * Feb 14-21 Parker Solar Probe perihelion pass * Mar 18 Solar Orbiter Venus flyby * May 8 Solar Orbiter Perihelion * May 12-19 Parker Solar Probe perihelion pass * Aug 8-15 Parker Solar Probe perihelion pass * Oct 5 Solar Orbiter Perihelion * Nov 5-12 Parker Solar Probe perihelion pass 2029: * Jun 10 Solar Orbiter Venus flyby * Jun 30 Ahead: Mercury transit 2030: * Sep 3 Solar Orbiter Venus flyby ######################################################################## Access the STEREO-SCI-OPS Home Page and Archives: http://listserv.jhuapl.edu/scripts/wa.exe?A0=STEREO-SCI-OPS Unsubscribe from the STEREO-SCI-OPS List: http://listserv.jhuapl.edu/scripts/wa.exe?TICKET=NzM5ODI3IHNoYWVsYS5pLmpvbmVzbWVjaG9sc2t5QE5BU0EuR09WIFNURVJFTy1TQ0ktT1BTIONO%2Fe5vX26v&c=SIGNOFF ######################################################################## ######################################################################## Access the STEREO-SCI-OPS Home Page and Archives: http://listserv.jhuapl.edu/scripts/wa.exe?A0=STEREO-SCI-OPS Unsubscribe from the STEREO-SCI-OPS List: http://listserv.jhuapl.edu/scripts/wa.exe?TICKET=NzM5OTQ2IHNoYWVsYS5pLmpvbmVzbWVjaG9sc2t5QE5BU0EuR09WIFNURVJFTy1TQ0ktT1BTICLw2GPoy6dt&c=SIGNOFF ########################################################################