STEREO Weekly Meeting Minutes for 2026-10-27 (Week 44) ANNOUNCEMENTS ------------- * None INSTRUMENT and SPACECRAFT STATUS -------------------------------- * The IMPACT/MAG instrument is currently experiencing a malfunction, and MAG data is temporarily unavailable. The instrument is expected to remain offline until at least Wednesday, October 28th. * Ahead is operating nominally. PLASTIC is in operational mode, but with a moderately higher than normal background rate. * After the initial loss of communications with the Behind observatory in September of 2014, NASA stopped periodic recovery operations with the last support on October 17, 2018. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 43 (Oct 19-25) * On day 293 (Oct 20), during the DSS-34 support, turbo decoder lock was lost intermittently between 0211 UT and 0221 UT, due to weather. This anomaly resulted in the loss of 21159 frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all the affected data. See DR #C119556 for more information. * On day 293 (Oct 20), the IMPACT Magnetometer (MAG) instrument stopped sending telemetry data to the IDPU (Data Processing Unit) at 1129 UT. The IMPACT team attempted commands to reinitialize the MAG interface, which did not recover the telemetry data. After the IMPACT team’s investigation, it was determined that an SEU (maybe from a GCR) possibly caused the MAG instrument to reset into a nonfunctional state. The IMPACT IPDU and SW * On day 293 (Oct 20), during the DSS-23 support, turbo decoder lock was lost briefly at 1907 UT. This anomaly resulted in the loss of 20 frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all the affected data. * On day 298 (Oct 25), during the DSS-53 support, turbo decoder lock was lost briefly at 0652 UT. This anomaly resulted in the loss of four frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all the affected data. * On day 298 (Oct 25), during the DSS-43 support, the transmitter was declared red, due to a hardware problem. This anomaly resulted in the loss of 5.4 hours of real-time commanding and 2-way tracking data. See DR #C119552 for more information. * On day 298 (Oct 25), the SECCHI instrument reset at 10:30:57 UT. The SECCHI team reconfigured the instrument to operational mode by 299-0535 UT. This was the 93rd reset of the SECCHI instrument on the Ahead observatory. * The average daily science data return for Ahead was 7.0 Gbits during this week. Week 44 (Oct 26 - Nov 1) * Ahead has twelve tracks during the week, all twelve at 480 kbps. * Monday, October 26th, was the 20th STEREO launch anniversary. * Wednesday, October 28 from 14:00-19:00 UT pass to be used for MAG recovery. * The 81st SECCHI stepped calibration roll is scheduled for Friday, October 30th, at 04:45 UT. * Daylight Savings Time ends Sunday, Nov 1st. Week 45 (Nov 2-8) * Ahead has twelve tracks during the week, three at 720 kbps, and nine at 480 kbps. * There is a DSN network maintenance event scheduled for Tuesday, November 3rd, from 00:00-04:00 UT. * The 21st battery discharge event will take place on Tuesday, November 3rd, at 14:05 UT. Week 46 (Nov 9-15) * Ahead has eleven tracks during the week, three at 720 kbps, and eight at 480 kbps. * APL will be closed on Wednesday, November 11 for the Veterans Day holiday. Week 47 (Nov 16-22) * Ahead has twelve tracks during the week, three at 720 kbps, and nine at 480 kbps. * On Tuesday, November 17th, there will be a DSN Emergency Control Center (ECC) test track on station 36, from 19:25 to 21:25 UT. There will be no SSR playback or instrument commanding during this track. * The 190th momentum dump is scheduled for Friday, November 20th, at 14:00 UT. Week 48 (Nov 23-29) * Ahead has thirteen tracks during the week, all thirteen at 480 kbps. * APL will be closed November 26th and 27th for the Thanksgiving holiday. * Beginning Saturday, November 28th, SECCHI will be conducting special observations in conjunction with the Parker Solar Probe perihelion. Week 49 (Nov 30- Dec 6) * Ahead has thirteen tracks one at 720 kbps and twelve at 480 kbps. Other COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 43: M Oct 19 (292) T Oct 20 (293) W Oct 21 (294) T Oct 22 (295) F Oct 23 (296) S Oct 24 (297) S Oct 25 (298) ------------------------------------------------------------------------------- Scheduled activities for Week 44: M Oct 26 (299) STEREO 20th Launch Anniversary T Oct 27 (300) W Oct 28 (301) T Oct 29 (302) F Oct 30 (303) Ahead: SECCHI stepped calibration roll, 04:45 UT S Oct 31 (304) S Nov 01 (305) ------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 02 (306) T Nov 03 (307) W Nov 04 (308) T Nov 05 (309) F Nov 06 (310) S Nov 07 (311) S Nov 08 (312) ------------------------------------------------------------------------------- Scheduled activities for Week 46: M Nov 09 (313) T Nov 10 (314) W Nov 11 (315) Veterans Day T Nov 12 (316) F Nov 13 (317) S Nov 14 (318) S Nov 15 (319) ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 16 (320) T Nov 17 (321) W Nov 18 (322) T Nov 19 (323) F Nov 20 (324) Ahead: Momentum dump, 14:00 UT S Nov 21 (325) S Nov 22 (326) ------------------------------------------------------------------------------- Scheduled activities for Week 48: M Nov 23 (327) T Nov 24 (328) W Nov 25 (329) T Nov 26 (330) Thanksgiving Day F Nov 27 (331) S Nov 28 (332) Start of PSP perihelion pass S Nov 29 (333) ------------------------------------------------------------------------------- Scheduled activities for Week 49: M Nov 30 (334) T Dec 1 (335) W Dec 2 (336) T Dec 3 (337) F Dec 4 (338) S Dec 5 (339) S Dec 6 (340) End of PSP perihelion pass Upcoming events: 2026: * Nov 28-Dec 6 Parker Solar Probe perihelion pass * Dec 24 Solar Orbiter Venus flyby 2027: * Feb 25-Mar 4 Parker Solar Probe perihelion pass * Feb 8 Solar Orbiter Perihelion * May 24-31 Parker Solar Probe perihelion pass * July 7 Solar Orbiter Perihelion * Aug 21-28 Parer Solar Probe perihelion pass * Nov 17-24 Parker Solar Probe perihelion pass * Dec 4 Solar Orbiter Perihelion 2028: * Feb 14-21 Parker Solar Probe perihelion pass * Mar 18 Solar Orbiter Venus flyby * May 8 Solar Orbiter Perihelion * May 12-19 Parker Solar Probe perihelion pass * Aug 8-15 Parker Solar Probe perihelion pass * Oct 5 Solar Orbiter Perihelion * Nov 5-12 Parker Solar Probe perihelion pass 2029: * Jun 10 Solar Orbiter Venus flyby * Jun 30 Ahead: Mercury transit 2030: * Sep 3 Solar Orbiter Venus flyby ######################################################################## Access the STEREO-SCI-OPS Home Page and Archives: http://listserv.jhuapl.edu/scripts/wa.exe?A0=STEREO-SCI-OPS Unsubscribe from the STEREO-SCI-OPS List: http://listserv.jhuapl.edu/scripts/wa.exe?TICKET=NzM5ODI3IHNoYWVsYS5pLmpvbmVzbWVjaG9sc2t5QE5BU0EuR09WIFNURVJFTy1TQ0ktT1BTIONO%2Fe5vX26v&c=SIGNOFF ######################################################################## ######################################################################## Access the STEREO-SCI-OPS Home Page and Archives: http://listserv.jhuapl.edu/scripts/wa.exe?A0=STEREO-SCI-OPS Unsubscribe from the STEREO-SCI-OPS List: http://listserv.jhuapl.edu/scripts/wa.exe?TICKET=NzM5OTQ2IHNoYWVsYS5pLmpvbmVzbWVjaG9sc2t5QE5BU0EuR09WIFNURVJFTy1TQ0ktT1BTICLw2GPoy6dt&c=SIGNOFF ########################################################################