STEREO Weekly Meeting Minutes for 2023-09-12 (Week 37) ANNOUNCEMENTS ------------- * None INSTRUMENT and SPACECRAFT STATUS -------------------------------- * Ahead is operating nominally. PLASTIC is in operational mode, but with a moderately higher than normal background rate. * Four years after the initial loss of communications anomaly with the Behind observatory, NASA has directed to cease periodic recovery operations with the last support on October 17, 2018. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 36 (Sep 4-10) * On day 252 (Aug 9), during the DSS-53 support, turbo decoder lock was lost briefly at 0446z. This anomaly resulted in the loss of 53 frames of SSR data. The MOPs team repositioned the SSR pointers during the support and recovered all of the affected data. See DR #M116270 for more information. * As of day 253 (Sep 10), all PLASTIC systems are behaving well, except there is a moderate background count rate, which the team is continuing to monitor. * The average daily science data return for Ahead was 6.5 Gbits during this week. Week 37 (Sep 11-17) * Ahead has twelve passes during the week, all at 720 kbps, and overall coverage is nominal. An ESA New Norcia pass was added for Saturday, Sep 16. * A station 55 pass on Thursday, Sep 14 (day 257) was converted to an ESA Cebreros pass due to problems at the DSN station. The times are the same. Week 38 (Sep 18-24) * Ahead has thirteen passes during the week, all at 720 kbps, and overall coverage is nominal. * The 160th momentum dump on Ahead is scheduled for Tuesday, Sep 19 (day 262), with ignition at 14:00 UT. * Network maintenance will be performed starting at 23:00 UT on Wednesday, Sep 20, and continuing on to 02:00 UT the next day. The MOPS will reconnect after the maintenance. * The second SECCHI high telemetry campaign starts on Saturday, Sep 23 (day 266), to coincide with the Parker Solar Probe perihelion pass. Both end on Oct 3. Week 39 (Sep 25- Oct 1) * Ahead has eighteen passes during the week, all at 720 kbps, and overall coverage is nominal. * Week two of the SECCHI high telemetry campaign, coincides with the Parker Solar Probe perihelion pass. * Solar Orbiter Remote Sensing Window 10 runs Oct 1-10. Week 40 (Oct 2-8) * Ahead has twelve passes during the week, all at 720 kbps, and overall coverage is nominal. * SECCHI high telemetry campaign ends Tuesday, Oct 3. Week 41 (Oct 9-15) * Ahead has ten passes during the week, all at 720 kbps, and overall coverage is nominal. An ESA Malague pass is scheduled for Wednesday, Oct 11. * Solar Orbiter Remote Sensing Window 11 runs from Oct 12-21. Week 42 (Oct 16-22) * Ahead has ten passes during the week, all at 720 kbps, and overall coverage is nominal. An ESA Malague pass is scheduled for Wednesday, Oct 18. * The 161st momentum dump is scheduled for Friday, Oct 20, with ignition at 21:00 UT. COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 37: M Sep 11 (254) T Sep 12 (255) W Sep 13 (256) Ahead: SECCHI COR2 5-min pB program test, 12-14 UT T Sep 14 (257) F Sep 15 (258) S Sep 16 (259) S Sep 17 (260) ------------------------------------------------------------------------------- Scheduled activities for Week 38: M Sep 18 (261) T Sep 19 (262) Ahead: Momentum dump, 14:00 UT W Sep 20 (263) T Sep 21 (264) F Sep 22 (265) S Sep 23 (266) Start of Parker Solar Probe perihelion pass, and SECCHI high telemetry campaign - COR2 18sec/2.5-min cadence S Sep 24 (267) COR2 18sec/2.5-min cadence Notes: * Parker Solar Probe perihelion pass, Sep 23-Oct 3, with SECCHI high telemetry campaign. ------------------------------------------------------------------------------- Scheduled activities for Week 39: M Sep 25 (268) COR2 5-min pB program T Sep 26 (269) COR2 5-min pB program W Sep 27 (270) COR2 5-min pB program 0-12 UT, COR2 18sec/2.5-min 12-24 UT T Sep 28 (271) F Sep 29 (272) S Sep 30 (273) S Oct 01 (274) Start of Solar Orbiter Remote Sensing Window 10. Notes: * Parker Solar Probe perihelion pass, Sep 23-Oct 3, with SECCHI high telemetry campaign. * Solar Orbiter Remote Sensing Window 10, Oct 1-10. ------------------------------------------------------------------------------- Scheduled activities for Week 40: M Oct 02 (275) T Oct 03 (276) End of Parker Solar Probe perihelion pass, and SECCHI high telemetry campaign W Oct 04 (277) T Oct 05 (278) F Oct 06 (279) S Oct 07 (280) S Oct 08 (281) Notes: * Parker Solar Probe perihelion pass, Sep 23-Oct 3, with SECCHI high telemetry campaign. * Solar Orbiter Remote Sensing Window 10, Oct 1-10. ------------------------------------------------------------------------------- Scheduled activities for Week 41: M Oct 09 (282) T Oct 10 (283) End of Solar Orbiter Remote Sensing Window 10 W Oct 11 (284) T Oct 12 (285) Start of Solar Orbiter Remote Sensing Window 11 F Oct 13 (286) S Oct 14 (287) S Oct 15 (288) Notes: * Solar Orbiter Remote Sensing Window 10, Oct 1-10. * Solar Orbiter Remote Sensing Window 11, Oct 12-21. ------------------------------------------------------------------------------- Scheduled activities for Week 42: M Oct 16 (289) T Oct 17 (290) W Oct 18 (291) T Oct 19 (292) F Oct 20 (293) Ahead: Momentum dump, 21:00 UT S Oct 21 (294) End of Solar Orbiter Remote Sensing Window 11 S Oct 22 (295) Notes: * Solar Orbiter Remote Sensing Window 11, Oct 12-21. ------------------------------------------------------------------------------- Upcoming events: 2023: * Oct 23-Nov 1 Solar Orbiter Remote Sensing Window 12 * Nov 13 Solar Orbiter Full Disk Mosaic * Dec 25-Jan 3 Parker Solar Probe perihelion pass * Dec 28 Solar Orbiter off-point for Parker Solar Probe 2024: * Mar 13-24 Solar Orbiter Remote Sensing Window 13 * Mar 26-Apr 4 Parker Solar Probe perihelion pass * Mar 27-Apr 9 Solar Orbiter Remote Sensing Window 14 * Apr 12-15 Solar Orbiter Remote Sensing Window 15 * Jun 26-Jul 5 Parker Solar Probe perihelion pass * Sep 26-Oct 5 Parker Solar Probe perihelion pass * Nov 6 Parker Solar Probe Venus flyby, in HI2-A field-of-view * Dec 20-29 Parker Solar Probe perihelion pass 2025: * Feb 18 Solar Orbiter Venus flyby * Mar 19-27 Parker Solar Probe perihelion pass * Apr 7 Ahead: Mercury transit * Jun 15-24 Parker Solar Probe perihelion pass 2026: * Dec 24 Solar Orbiter Venus flyby 2028: * Mar 18 Solar Orbiter Venus flyby 2029: * Jun 10 Solar Orbiter Venus flyby * Jun 30 Ahead: Mercury transit 2030: * Sep 3 Solar Orbiter Venus flyby