STEREO Weekly Meeting Minutes for 2020-09-08 (Week 37) ANNOUNCEMENTS ------------- * None. INSTRUMENT and SPACECRAFT STATUS -------------------------------- * Ahead is operating nominally. PLASTIC is in operational mode, but with a high background rate. * Four years after the initial loss of communications anomaly with the Behind observatory, NASA has directed to cease periodic recovery operations with the last support on October 17, 2018. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 36 (Aug 31-Sep 6) * On day 244 (Aug 31), during the DSS-63 support for Ahead, turbo decoder lock was lost intermittently from 1911z through 1915z. This anomaly resulted in the loss of eleven frames of SSR data. On the subsequent DSS-26 support, MOPs repositioned the SSR pointers and recovered all the affected DSS-63 data. * On day 250 (Sep 6), during the DSS-63 support for Ahead, the transmitter tripped offline at 1204z, due to a Collector over temperature interlock. This anomaly resulted in the loss of 44 minutes of real-time commanding and 2-way tracking data, and the loss of 3787 frames of SSR data. On the subsequent DSS-14 support, MOPs repositioned the SSR pointers and recovered all the affected DSS-63 data. See DR #M112588 for more information. * As of day 250 (Sep 6), all PLASTIC systems on Ahead are behaving well, except there is a high background count rate, which the team is continuing to monitor. * The average daily science data return for Ahead was 7.1 Gbits during this week. Week 37 (Sep 7-13) * Ahead has ten passes during the week, and overall coverage is nominal. There are six passes at 720 kbps, three at 480 kbps, and one at 360 kbps. * Monday, Sep 7, is Labor Day, which is an APL holiday. * An ESA New Norcia pass is scheduled for Thursday, Sep 10, from 08:05-10:45 UT. Week 38 (Sep 14-20) * Ahead has twelve passes during the week, and overall coverage is nominal. There are five passes at 720 kbps, four at 480 kbps, and three at 360 kbps. * The 131st momentum dump on Ahead is scheduled for Thursday, Sep 17, with ignition at 21:45 UT. * An L3VPN SLE bind test with DSN will be carried out on Monday, Sep 14, between 14:30-16:30 UT. * Betelgeuse will be visible in SECCHI HI2 without rolling the spacecraft from Sep 16 to Nov 18. The main purpose of observing Betelgeuse during this time would be for cross-calibration with other telescopes. The next period when Betelgeuse can be observed with 180 degree roll is May 13-Jul 15, 2021. Week 39 (Sep 21-27) * Ahead has twelve passes during the week, and overall coverage is nominal. There are four passes at 720 kbps, two at 480 kbps, and six at 360 kbps. * The sixth SECCHI campaign for the Parker Solar Probe perihelion pass runs from Sep 22 to Oct 2. Week 40 (Sep 28-Oct 4) * Ahead has thirteen passes during the week, and overall coverage is nominal. There are four passes at 720 kbsp, four at 480 kbps, four at 360 kbps, and one at 160 kbps. * The sixth SECCHI campaign for the Parker Solar Probe perihelion pass runs from Sep 22 to Oct 2. Week 41 (Oct 5-11) * Ahead has fourteen passes during the week, and overall coverage is nominal. There are six passes at 720 kbps, three at 480 kbps, four at 360 kbps, and one at 160 kbps. * The 55th SECCHI stepped calibration roll is scheduled for Monday, Oct 5, starting at 07:45 UT. Week 42 (Oct 12-18) * Ahead has eleven passes during the week, and overall coverage is nominal. There are five passes at 720 kbps, two at 480 kbps, three at 360 kbps, and one at 160 kbps. * An ESA Cebreros pass is scheduled for Monday, Oct 12, 16:25-19:25. * A project interfact test with the new Madrid 34 meter station 56 is scheduled for Friday, Oct 16. COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 37: M Sep 07 (251) Labor Day T Sep 08 (252) W Sep 09 (253) T Sep 10 (254) F Sep 11 (255) S Sep 12 (256) S Sep 13 (257) ------------------------------------------------------------------------------- Scheduled activities for Week 38: M Sep 14 (258) T Sep 15 (259) W Sep 16 (260) T Sep 17 (261) Ahead: Momentum dump, 21:45 UT F Sep 18 (262) S Sep 19 (263) S Sep 20 (264) Notes: * Betelgeuse visible in SECCHI HI2 without roll, Sep 16-Nov 18 ------------------------------------------------------------------------------- Scheduled activities for Week 39: M Sep 21 (265) T Sep 22 (266) Start of Parker Solar Probe perihelion pass W Sep 23 (267) T Sep 24 (268) F Sep 25 (269) S Sep 26 (270) S Sep 27 (271) Notes: * Parker Solar Probe perihelion pass, Sep 22-Oct 2. ------------------------------------------------------------------------------- Scheduled activities for Week 40: M Sep 28 (272) T Sep 29 (273) W Sep 30 (274) T Oct 01 (275) F Oct 02 (276) End of Parker Solar Probe perihelion pass S Oct 03 (277) S Oct 04 (278) Notes: * Parker Solar Probe perihelion pass, Sep 22-Oct 2. ------------------------------------------------------------------------------- Scheduled activities for Week 41: M Oct 05 (279) Ahead: Stepped calibration roll, 07:45 UT T Oct 06 (280) W Oct 07 (281) T Oct 08 (282) F Oct 09 (283) S Oct 10 (284) S Oct 11 (285) ------------------------------------------------------------------------------- Scheduled activities for Week 42: M Oct 12 (286) T Oct 13 (287) W Oct 14 (288) T Oct 15 (289) F Oct 16 (290) Ahead: Project Interface Test with station 56 S Oct 17 (291) S Oct 18 (292) ------------------------------------------------------------------------------- Upcoming events: Behind events are contingent on recovering the spacecraft. 2020: * Sep 16-Nov 18 Betelgeuse visible in SECCHI HI2 without roll 2021: * Jan 13-23 Parker Solar Probe perihelion pass * Feb 20 Parker Solar Probe Venus flyby * Apr 25-May 4 Parker Solar Probe perihelion pass * May 13-Jul 15 Betelgeuse visible in SECCHI HI2 with 180 degree roll * Aug 5-15 Parker Solar Probe perihelion pass * Oct 16 Parker Solar Probe Venus flyby * Nov 17-26 Parker Solar Probe perihelion pass 2022: * Feb 21-Mar 2 Parker Solar Probe perihelion pass * May 28-Jun 7 Parker Solar Probe perihelion pass * Sep 2-11 Parker Solar Probe perihelion pass * Dec 7-16 Parker Solar Probe perihelion pass 2023: * Mar 13-23 Parker Solar Probe perihelion pass * May 5 Behind: Mercury transit * Jun 17-27 Parker Solar Probe perihelion pass * Jul 17 Behind: Closest approach to Earth * Aug 13 Ahead: Closest approach to Earth * Aug 21 Parker Solar Probe Venus flyby * Sep 23-Oct 3 Parker Solar Probe perihelion pass * Dec 25-Jan 3 Parker Solar Probe perihelion pass 2024: * Mar 26-Apr 4 Parker Solar Probe perihelion pass * Jun 26-Jul 5 Parker Solar Probe perihelion pass * Sep 26-Oct 5 Parker Solar Probe perihelion pass * Nov 6 Parker Solar Probe Venus flyby, in HI2-A field-of-view * Dec 20-29 Parker Solar Probe perihelion pass 2025: * Mar 19-27 Parker Solar Probe perihelion pass * Apr 7 Ahead: Mercury transit * Jun 15-24 Parker Solar Probe perihelion pass 2026: 2027: * Feb 1 Behind: Mercury transit 2028: 2029: * Jun 30 Ahead: Mercury transit