STEREO Weekly Meeting Minutes for 2007-11-20 (Week 47) ANNOUNCEMENTS ------------- * No announcements INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spececraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 45 * A momentum dump was successfully performed on Ahead on day 312 (Nov 8). * The average daily downlink was 6.8 gigabits on Ahead and 7.1 gigabits on Behind. * IMPACT began a 48 hour SEPT calibration on day 310 (Nov 6) which ended on day 312 (Nov 8). Week 46 * Ground equipment problems were encountered during the station 34 pass with Ahead on day 317 (Nov 13). No data were lost. * The DSN central LAN switch failed during the station 25 pass with Ahead on day 320 (Nov 16). Commands were resent manually. No data were lost. * The average daily downlink was 7.7 gigabits on Ahead, and 8.3 gigabits on Behind. * On day 317, an extra "return-to-service" engineering track on station 45 for Behind started four minutes late because of a problem with New Horizons. This led to a data gap in the spacecraft data, but not the instrument data. At 05:54 during the same track, the transmitter went red because of an interlock alarm. This led to the loss of some SECCHI data. Week 47 * No unusual events are planned. * SECCHI's synoptic partition started at 100% full at the beginning of the Behind pass today (Nov 20). APL will free up some space when possible. This has happened recently on two other occasions, day 315 (Nov 11) on Ahead, and day 314 (Nov 10) on Behind. Week 48 * SECCHI software update 5.07 will be enabled on Monday, Nov 26, on Ahead at 16:30, and Behind at 12:00 UT. * There will be a momentum dump on Behind on Wednesday, Nov 28 at 16:00 UT. Weeks 49 & 50 * Nothing unusual planned Other * A momentum dump is expected on Ahead the week before Christmas, probably Dec 19. * The second SECCHI campaign is scheduled for January 7-20. * Messenger will fly by Mercury January 14th, during the SECCHI campaign. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 19 (323) T Nov 20 (324) W Nov 21 (325) T Nov 22 (326) F Nov 23 (327) S Nov 24 (328) S Nov 25 (329) ------------------------------------------------------------------------------- Scheduled activities for Week 48: M Nov 26 (330) SECCHI FSW patch 5.07, Ahead: 16:30, Behind: 12:00 T Nov 27 (331) W Nov 28 (332) Behind: Momentum dump 16:00 T Nov 29 (333) F Nov 30 (334) S Dec 01 (335) S Dec 02 (336) ------------------------------------------------------------------------------- Scheduled activities for Week 49: M Dec 03 (337) T Dec 04 (338) W Dec 05 (339) T Dec 06 (340) F Dec 07 (341) S Dec 08 (342) S Dec 09 (343) ------------------------------------------------------------------------------- Scheduled activities for Week 50: M Dec 10 (344) T Dec 11 (345) W Dec 12 (346) T Dec 13 (347) F Dec 14 (348) S Dec 15 (349) S Dec 16 (350) ------------------------------------------------------------------------------- Upcoming events: 2007: * Dec 2007-May 2008 Ulysses quadrature 2008: * Jan 7-20 SECCHI campaign * Jan 14 Messenger - Mercury fly-by * Mar 20 - Apr 16 Whole Heliosphere Interval * Apr 21 - May 16 SUMER campaign * Oct 6 Messenger - Mercury fly-by