STEREO Weekly Meeting Minutes for 2007-09-04 (Week 36) ANNOUNCEMENTS ------------- * The DMZ at APL underwent maintenance on Wednesday evening, August 29th. Instrument workstations at the MOC may need to reconnect. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spececraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 35 * On day 241 (Aug 29), during the Ahead track on station 241, the command state went to abort. The command link was reestablished, and some SECCHI commands were resent. The cause of this problem is unknown. * The average daily downlink was 7.3 gigabits for Ahead, and 7.2 gigabits for Behind. * There were four separate instances of problems communicating with Behind from station 55 in Madrid. The station was experiencing a coolant problem with the transmitter. This led to problems on days 241, 242, 243 and 245. There are gaps in the data because of the resweeps used to reestablish contact. The problem should now be fixed, and the track yesterday on that station went well. * New calibration tables for the IMPACT SIT were uploaded to Behind on day 240 (Aug 28). * On day 244, during the Behind track on station 34, SECCHI had a watchdog error. This caused the GT rate usage autonomy rule to be tripped. SECCHI was recovered during the following track. This is the 3rd watchdog error on Behind--the previous error was 2 months earlier. The SECCHI team is looking into what options they have for making recovery more automatic. * SECCHI had problems connecting from their POC at APL on Saturday. This may be connected to the DMZ maintenance that occured last Wednesday. APL will generate a problem report. Week 36 * The MOC is performing a fault protection autonomy load to EEPROM to clear out configuration macros used prior to launch. * There are a number of extra tracks planned on both spacecraft. Week 37 * SELENE launch from Japan is planned for day 256 (Sep. 13). This causes time changes on some tracks. * PLASTIC flight software updates will be loaded to Behind on Tuesday, Sep 11, with follow-up on Wednesday. Week 38 * The DSN schedules for this week are not yet available. Week 39 * The launch of DAWN is scheduled for Sept. 26 at 11:29 UTC. DSN schedules are still being worked out. * Momentum dumps for both spacecraft are pencilled in for Sept. 26, depending on the DSN schedule. Week 40 * HGA calibrations are scheduled for both spacecraft on day 276 (Oct 3), depending on the DSN schedule. Other * HI1-B images occasionally show multiple star images which are apparently caused by changes in pointing during the 40 minute exposures. This is seen periodically. Guide telescope data show that this is not due to a change in pointing of the spacecraft. The SECCHI team will produce a list of dates and times when this effect is seen, to compare against other data. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 36: M Sep 03 (246) T Sep 04 (247) W Sep 05 (248) T Sep 06 (249) F Sep 07 (250) S Sep 08 (251) S Sep 09 (252) ------------------------------------------------------------------------------- Scheduled activities for Week 37: M Sep 10 (253) T Sep 11 (254) Behind: PLASTIC flight software update W Sep 12 (255) Behind: PLASTIC flight software update followup T Sep 13 (256) SELENE launch F Sep 14 (257) S Sep 15 (258) S Sep 16 (259) ------------------------------------------------------------------------------- Scheduled activities for Week 38: M Sep 17 (260) T Sep 18 (261) W Sep 19 (262) T Sep 20 (263) F Sep 21 (264) S Sep 22 (265) S Sep 23 (266) ------------------------------------------------------------------------------- Scheduled activities for Week 39: M Sep 24 (267) T Sep 25 (268) W Sep 26 (269) Both: Momentum dump DAWN launch, 11:29 UT T Sep 27 (270) F Sep 28 (271) S Sep 29 (272) S Sep 30 (273) ------------------------------------------------------------------------------- Scheduled activities for Week 40: M Oct 01 (274) T Oct 02 (275) W Oct 03 (276) Both: HGA calibrations T Oct 04 (277) F Oct 05 (278) S Oct 06 (279) S Oct 07 (280) ------------------------------------------------------------------------------- Upcoming events: 2007: * Nov 02 - Nov 16 JOPs 190,191,192 * Nov 02 - Nov 16 SUMER campaign * Nov (TBD) JOP 193 * Dec 2007-May 2008 Ulysses quadrature