STEREO Weekly Meeting Minutes for 2007-07-17 (Week 29) ANNOUNCEMENTS ------------- * None. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spececraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 28 * Average daily downlink was 6.4 gigabits on Ahead and 7.0 gigabits on Behind. * High gain antenna calibrations were performed on both spacecraft on day 192. The telemetry rate on Behind was reduced to 96 kbps during the calibration to avoid telemetry losses seen during the Ahead calibration. * On day 194, during the Behind pass, the DSN had uplink failures from time to time. This resulted in the stored command not being downlinked at the end of track, but no other problems. Week 29 * Test of disabling usage of guide telescope data will be performed on both spacecraft on Wednesday, day 199. Week 30 * There will be a momentum dump on Behind on day 206 at 19:00 UT. Week 31 * The Phoenix launch is scheduled for this week. The DSN schedules for the nominal launch window are in hand, but the contingency schedules have not yet been delivered. * Current plans call for one pass per day on Ahead, and 12 passes over the week for Behind. Other * There was a discussion of the IMU disable test that occured on day 178. The SECCHI team will collect data about the effect of this test on the instrument data, and report back to APL. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 29: M Jul 16 (197) JOP 188 continues T Jul 17 (198) W Jul 18 (199) Disable GT test, 10 minutes, Ahead: 12:11, Behind: 17:27 T Jul 19 (200) F Jul 20 (201) S Jul 21 (202) S Jul 22 (203) Notes: * JOP 188, Prominence Mass Composition and Variability Study, Jul 1-Aug 5 ------------------------------------------------------------------------------- Scheduled activities for Week 30: M Jul 23 (204) JOP 188 continues T Jul 24 (205) W Jul 25 (206) Behind: Momentum dump, 19:00 UT T Jul 26 (207) F Jul 27 (208) S Jul 28 (209) S Jul 29 (210) Notes: * JOP 188, Prominence Mass Composition and Variability Study, Jul 1-Aug 5 ------------------------------------------------------------------------------- Scheduled activities for Week 31: M Jul 30 (211) JOP 188 continues T Jul 31 (212) W Aug 01 (213) T Aug 02 (214) F Aug 03 (215) S Aug 04 (216) S Aug 05 (217) JOP 188 ends Notes: * JOP 188, Prominence Mass Composition and Variability Study, Jul 1-Aug 5 ------------------------------------------------------------------------------- Upcoming events: * May 7 -Aug 10 Hinode eclipse season * Jul 1 -Aug 5 JOP 188, Prominence Mass Composition and Variability * Aug 8-18 JOP 194, Filament/Cavity-CME-ICME IHY-CIP campaign, (CIPs 7,21,23,51) * Aug 19 Ulysses ecliptic plane passage * Oct 22 - Nov 2 SUMER campaign (JOPs 190,191,192,193) * Dec 2007-May 2008 Ulysses quadrature