STEREO Weekly Meeting Minutes for 2006-11-08 (Week 45) ANNOUNCEMENTS ------------- * The optional delta-V maneuver at A2 has been cancelled. * Next week adding A2+ maneuver on day 318 (Ahead 14:00, Behind: 16:00), with day 319 as backup. * The next meeting will return to its regular Tuesday 12:30 ET date and time. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * Operations have been smooth so far. Maneuvers have been nominal. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Maneuvers: * Some future maneuvers may be canceled, but that still has to be determined and will be affected by the outcomes of future maneuvers. * Instrument teams want to know if they will be turned off during maneuvers. Instruments will probably be off during P2 eclipse, although that is not final. The decision for the A2+ maneuver will be made by Friday at the latest. * SECCHI in particular would like to have the option of leaving heaters on during maneuvers if power is available, even if the macro is turned off. * IMPACT will probably turn off during maneuvers DSN: * DSN schedule being changed. New schedule should be available by end of Friday Nov. 10. STEREO has one 3 hr track/day (per spacecraft), with 2 days of continuous coverage for maneuvers next week. * During continuous coverage solid state recorder dumps are still being made except during maneuver periods. * A back up antenna is needed for P2 maneuver. DSN is working on details. Instruments: IMPACT: * The IMPACT team is finding that the STEU are saturated when they are not in the dark. This is thought to be due to the Earth, but that will not be certain until the spacecraft move farther away. Preliminary data from the eclipse looks like all detectors ok. No science data expected until Heliospheric orbit. * Two or three days are needed to check out SEP, so IMPACT may want to move that check out to a later date when they can get a few days without having to turn off the instrument. SECCHI: * SECCHI calibration in week 46. * Guide telescope to be enabled in week 45 PLASTIC: * PLASTIC is working with their high voltages. They do a little of this everyday and are pretty flexible about the exact time they do it. STEREO Science Center: * Currently ingesting both Flight Dynamics and Mission Planning ephemerides. The Flight Dynamics predictive ephemerides don't include the results of the maneuvers. These will eventually be combined into a single product. * SECCHI and PLASTIC data are currently being ingested. * SSC is producing a simplified version of weekly plan. Please tell Bill Thompson if you notice any thing on it which is wrong or incomplete. Other: * The question that was raised was whether the orbit of the Behind spacecraft could be tweaked within the specifications of the current mission design to reduce the amount of time that the SPE angle (between the Sun and Earth as viewed from Behind) is in the range from 53 to 70 degrees. This is when the effect of Earth on the stray light in HI-2B is worst. If the time spent in this range of SPE angles could be reduced by even a few days, that would benefit the science return from HI-B. This is _not_ related to the increase in the Behind aphelion distance. The specific orbital change being studied would have ramifications for IMPACT and PLASTIC however, and is not currently being planned. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 06 (310) Ahead: EA mode test T Nov 07 (311) W Nov 08 (312) T Nov 09 (313) F Nov 10 (314) S Nov 11 (315) Ahead: 1st enabling of GT use A2 Apogee S Nov 12 (316) Behind: A2 Backup Delta V Maneuver ------------------------------------------------------------------------------- Scheduled activities for Week 46: M Nov 13 (317) Behind: 1st enabling of GT use Power up IMPACT SEP T Nov 14 (318) A2+ Prime Delta V Maneuver W Nov 15 (319) A2+ Backup Delta V Maneuver T Nov 16 (320) F Nov 17 (321) P2 Perigee & Delta V Maneuver S Nov 18 (322) S Nov 19 (323) ------------------------------------------------------------------------------- Scheduled activities for Week 47: M Nov 20 (324) T Nov 21 (325) W Nov 22 (326) A3 Prime Delta V Maneuver IMPACT MAG rolls, HGA end-to-end slew T Nov 23 (327) A3 Apogee F Nov 24 (328) A3 Backup Delta V Maneuver S Nov 25 (329) S Nov 26 (330) -------------------------------------------------------------------------------