STEREO Weekly Meeting Minutes for 2006-10-24 (Week 43) ANNOUNCEMENTS ------------- * Instruments stay on during A1 maneuver unless there's a need to turn them off. * Reminder: Daylight savings time ends October 29th. INSTRUMENT STATUS ----------------- OPERATIONS CONSTRAINTS ---------------------- * Track plans out, weekly schedule. Week 44 schedule out for Ahead; Behind will be very similar. * Continuing to plan week 45, containing P1 burn, and A2 burn if needed. * Early Ops Schedule has not changed. * Week 46, 1st enabling of GT use--RT event. * PLASTIC stepping up high voltage. * Powering up SEP suite. * Power down for P2 maneuver--deterministic. About 3.3 m/s delta-V. Maneuver on Madrid inbound, about 1 hour before perigee. 30 minute gap, then post recovery Canberra. Backup maneuver on outbound track. * Working on DSN track coverage for weeks 47 and 48. Plans for Oct 27,28 launch dates sitting on shelf if needed. * Boom deployment, starts at 15:00 for Ahead. Behind follows. * APL asks about foreign nationals who need to be at the MOC for commissioning. * Telephone numbers for launch status: 240-228-6851 443-778-6851 * It's been decided to not have daily meetings for commissioning, only these weekly telecons. * Mag rolls week 47 * No eclipse during S1, instruments stay on. * Putting together procedures for HI roll and off-point maneuvers. * EUVI off-point tested, still looking at data. * HGA event testing for MAG in progress. Added 30 degree slew for testing in progress. COORDINATED OBSERVATIONS ------------------------ Scheduled activities for Week 43: M Oct 23 (296) T Oct 24 (297) W Oct 25 (298) T Oct 26 (299) Launch (00:38 UT; 8:38 EDT 25 October) F Oct 27 (300) Power on SECCHI, move doors from superclosed to closed Power on SWAVES, deploy antennas S Oct 28 (301) 1st Engineering Burn (Ahead 13:30, Behind 16:30) Power on IMPACT IDPU, SWEA, Deploy SWEA cover Power on PLASTIC S Oct 29 (302) Power on IMPACT/SWEA HVPS ------------------------------------------------------------------------------- Scheduled activities for Week 44: M Oct 30 (303) A1 Prime Delta V Maneuver (Ahead 18:00, Behind 21:00) T Oct 31 (304) A1 Apogee (Ahead 17:17, Behind 16:16) A1 Backup #1 Delta V Maneuver (Ahead 18:00, Behind 21:00) W Nov 01 (305) A1 Backup #2 Delta V Maneuver (Ahead 18:00, Behind 21:00) Deploy IMPACT boom T Nov 02 (306) 2nd Engineering Burn F Nov 03 (307) S Nov 04 (308) S Nov 05 (309) ------------------------------------------------------------------------------- Scheduled activities for Week 45: M Nov 06 (310) P1 Perigee & Delta V Maneuver (Ahead 10:36, Behind 08:33) Ahead: EA mode test T Nov 07 (311) W Nov 08 (312) T Nov 09 (313) F Nov 10 (314) Behind: A2 Prime Delta V Maneuver (22:43) S Nov 11 (315) Ahead: A2 Prime Delta V Maneuver (01:38) Ahead: 1st enabling of GT use Behind: A2 Apogee (22:43) S Nov 12 (316) Ahead: A2 Apogee (01:38) Behind: A2 Backup Delta V Maneuver (22:43)