STEREO Weekly Meeting Minutes for 2014-11-25 (Week 48) ANNOUNCEMENTS ------------- * Ahead operations on the first HGA antenna side lobe have been extended through Jan 4, 2015. * There will be no STEREO operations telecon on Dec 30. INSTRUMENT and SPACECRAFT STATUS -------------------------------- * Ahead is operating on the first side lobe of the HGA to prevent overheating of the feed assembly. * There are currently no communications with the Behind spacecraft. See below for details. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 47 (Nov 17-23) * On day 321 (Nov 17), the planned DSS-14 support for Ahead did not occur due to the antenna being declared red due to a mechanical problem. No other 70 meter stations were available. This anomaly resulted in the loss of 2.25 hours of real-time science data. See DR #G115671 for more information. * The Ahead observatory is operating on the first side lobe of the HGA to prevent overheating of the HGA feed assembly which is currently at 115 degrees C with the HGA angle at 7.8 degrees, with respect to the spacecraft-Sun line. * On day 322 (Nov 18), MOps macro release 1.1.25 was loaded to C&DH EEPROM on Ahead. This release updated the SSR playback ratio from 2 to 3 for spacecraft playbacks during side lobe operations. * The average daily science data return for Ahead, while operating on the first side lobe on the HGA, was 69 Mbits during this week. * Detailed status of the activities that occurred on the Behind loss of communication anomaly, which occurred on day 274, are listed below. To ensure communications on the LGA during long term recovery efforts, the Behind track coverage have been reduced to 3 hour 70 meter supports for 3 days in a row each week. * On days 321 through 323 (Nov 17-19), during the DSN 70 meter supports for Behind, recovery commanding was conducted on ensuring that the transmitter is in its operational configuration. No signal was received by the DSN radio science receivers. * Significant findings to date: 1. Analysis of the three DSN extracted telemetry frames from the carrier signal just before the planned observatory reset/anomaly occurred on day 274, October 1st, showed nominal performance of the spacecraft, i.e., no anomalies, IMU off, and the star tracker providing an attitude solution. 2. Post reset, from the very limited telemetry, three packets, extracted from the carrier signal by the DSN, the X-axis gyro on IMU-A had failed. Unfortunately, this telemetry contained only G&C anomaly data and no spacecraft summary data, i.e., the state of the RF, G&C, fault protection and other subsystems is not known at the time of the anomaly. With a failed IMU and the star tracker being off-line for an undetermined duration, the sun sensors will keep the observatory pointed at the Sun, though the G&C will not have any roll knowledge, and cannot roll the observatory as part of the safing configuration to re-establish communications on the LGAs. From analysis of this telemetry and initial G&C simulations, it is highly suspected that the observatory is rotating about the principal access of inertia due to an autonomous momentum dump initiated by bad gyro data flagged good, but this has not yet been confirmed. 3. At least two anomalies occurred post reset, the star tracker not promoting to AAD mode and the X-axis gyro failure. Unfortunately, due to the number of possible combinations, the STEREO fault protection system is not designed for simultaneous failures. * The cause and effect analysis of the loss of communications from the LGAs is continuing. G&C simulations using the bad gyro data flagged good are continuing to better understand the potential impact to the observatory state. Recovery from a negative power state is also being investigated. While the recovery and analysis efforts continue on Behind, as the Ahead observatory will enter superior solar conjunction in March, the primary focus of the engineering team is on developing operational configuration changes to add robustness to the G&C rate sensor usage to ensure the Ahead observatory’s continued safety. * Once communications are restored and the anomaly resolved, the operational plan for exiting the solar conjunction testing will continue to return the Behind observatory back to nominal science data collection as soon as safely possible. Week 48 (Nov 24-30) * Yesterday (Nov 24) the Ahead spacecraft was switched over to the new spaceweather + spacecraft housekeeping mode after each track. * Later today, G&C parameters version 1.3.2 will written to RAM and EEPROM to add robustness. * The MOC will be closed for the Thanksgiving holiday Thursday and Friday, Nov 27-28. * The Hayabusa 2 mission launch window opens on Sunday, Nov 30, and continues for 6 days. The only effect on the STEREO DSN schedules is that some passes may be shortened if it's launched on the last day in the window. * Ahead has 11 passes during the week, all at 10 kbps on the first side lobe, in IMPACT-prime mode. * Behind has three 70 passes during the week to attempt recovery, between Friday-Sunday. Week 49 (Dec 1-7) * MOps macros 1.1.26 and data handling parameters 1.1.10 will be loaded to EEPROM on Monday, Dec 1, during the station 63 pass. These support the new 633 bps spaceweather + spacecraft housekeeping mode between DSN passes. * The MOC will start dumping temperature set point data from the Ahead star tracker in preparation for activities in following weeks. * Space weather and housekeeping beacon data will be brought down during an ESA New Norcia pass on Dec 2, and during a station 55 pass on Thursday, Dec 4. These will be the first regularly scheduled 34 meter passes with this new 633 bps configuration. * Ahead has 11 passes during the week, nine at 10 kbps on the first side lobe, in SWAVES-prime mode, and two at the 633 bps beacon rate. * Behind has 3 passes during the week to attempt recovery, between Tuesday-Thursday. Week 50 (Dec 8-14) * The 74th momentum dump on Ahead is scheduled for Tuesday, Dec 9, with ignition at 20:30 UT. System momentum will be set to 8 N-m-s instead of the usual 15 N-m-s to support the star tracker thermo-electric cooler set point modifications in week 51. * On Sunday, Dec 14, during the station 43 pass for Ahead, IMU-B will be powered on in preparation for the star tracker activities the next day. * Ahead has 10 passes during the week, eight at 10 kbps on the first side lobe in IMPACT-prime mode, and two at the 633 bps beacon rate on Wednesday and Friday. * Behind has 3 passes during the week to attempt recovery, between Monday-Wednesday. Week 51 (Dec 15-21) * The set-point temperature on the Ahead star tracker will be lowered to -10 C during the station 43 track early Monday, Dec 15. This is to help bring the star tracker back up into operational mode more quickly. As the star tracker ages, the manufacturer recommends lowering the temperature to reduce noise. The first step in the process is to switch DFDs to bring down more data from the star tracker and IMU, which means that there will be no instrument telemetry. After the set point temperature is lowered, the star tracker will be promoted back up to operating mode, at which point the IMU will be turned off. When all activities are completed, the instrument telemetry will be re-enabled. * A return-to-service track for station 14 is scheduled for Monday, Dec 15. There will be no instrument commanding or SSR playback during this track. * Ahead has 7 passes during the week, all at 10 kbps on the first side lobe in SWAVES-prime mode. * Behind has 3 passes during the week to attempt recovery, between Wednesday-Friday. Week 52 (Dec 22-28) * Thursday, Dec 25, is Christmas. APL will be closed Dec 25-26 for the holiday. * Ahead has 10 passes during the week, all at 10 kbps on the first side lobe in IMPACT-prime mode. * Behind has 3 passes during the week to attempt recovery, between Monday-Wednesday. Week 01 (Dec 29-Jan 4) * APL will be closed Jan 1-2 for the New Year holiday. * The HGA angle bias for the Ahead spacecraft will be updated on Jan 4 in prepartion for second-side lobe operations in the following week. Instruments should configure their instruments in advance of the switch on Jan 5. * Ahead has 8 passes during the week, all at 10 kbps on the first side lobe in SWAVES-prime mode. * Behind has 3 passes during the week to attempt recovery, between Tuesday-Thursday. Week 02 (Jan 5-11) * Second side lobe operations at 3 kbps on Ahead start Monday, Jan 5. * The 75th momentum dump on Ahead is scheduled for Tuesday, Jan 6, with ignition at 13:00. This is earlier than normal because of the lower target used for the previous momentum dump. * Ahead has 6 passes during the week, all at 3 kbps on the second side lobe. * Behind has 3 passes during the week to attempt recovery, between Friday-Sunday. Week 03 (Jan 12-18) * Ahead has 9 passes during the week, all at 3 kbps on the second side lobe. * Behind has 3 passes during the week to attempt recovery, between Monday-Wednesday. COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 48: M Nov 24 (328) T Nov 25 (329) W Nov 26 (330) T Nov 27 (331) Thanksgiving F Nov 28 (332) S Nov 29 (333) S Nov 30 (334) Notes: * Ahead operating on first side lobe, in IMPACT-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 49: M Dec 01 (335) T Dec 02 (336) W Dec 03 (337) T Dec 04 (338) F Dec 05 (339) S Dec 06 (340) S Dec 07 (341) Notes: * Ahead operating on first side lobe, in SWAVES-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 50: M Dec 08 (342) Ahead: Start of second side-lobe operations T Dec 09 (343) Ahead: Momentum dump, 20:30 UT W Dec 10 (344) T Dec 11 (345) F Dec 12 (346) S Dec 13 (347) S Dec 14 (348) Notes: * Ahead operating on first side lobe, in IMPACT-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 51: M Dec 15 (349) Ahead: Star tracker temperature set-point reset Ahead: Return-to-service track for D14 T Dec 16 (350) W Dec 17 (351) T Dec 18 (352) F Dec 19 (353) S Dec 20 (354) S Dec 21 (355) Notes: * Ahead operating on first side lobe, in SWAVES-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 52: M Dec 22 (356) T Dec 23 (357) W Dec 24 (358) T Dec 25 (359) Christmas F Dec 26 (360) S Dec 27 (361) S Dec 28 (362) Notes: * Ahead operating on first side lobe, in IMPACT-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 01: M Dec 29 (363) T Dec 30 (364) W Dec 31 (365) T Jan 01 (001) New Year F Jan 02 (002) S Jan 03 (003) S Jan 04 (004) Ahead: Update HGA angle bias for second side lobe operations. Notes: * Ahead operating on first side lobe, in SWAVES-prime mode. ------------------------------------------------------------------------------- Scheduled activities for Week 02: M Jan 05 (005) Ahead: Start of second side operations. T Jan 06 (006) Ahead: Momentum dump, 13:00 UT W Jan 07 (007) T Jan 08 (008) F Jan 09 (009) S Jan 10 (010) S Jan 11 (011) Notes: * Ahead operating on second side lobe. ------------------------------------------------------------------------------- Scheduled activities for Week 03: M Jan 12 (012) T Jan 13 (013) W Jan 14 (014) T Jan 15 (015) F Jan 16 (016) S Jan 17 (017) S Jan 18 (018) Notes: * Ahead operating on second side lobe. ------------------------------------------------------------------------------- Upcoming events: Behind events are contingent on recovering the spacecraft. 2015: * Jan 5 Ahead: HGA on 2nd side lobe * Jan 6 Behind: HGA on 2nd side lobe * Jan 12 Behind: Test with 34 meter at 633 bps * Jan 20 Behind: Instrument power down * Jan 22 - Mar 23 Behind: Spacecraft behind Sun * Mar DAWN - Ceres arrival * Mar 22 Ahead: Instrument power down * Mar 23 - Apr 06 Behind: S/C SSR Playback at 3 kbps * Mar 24 - Jul 07 Ahead: Spacecraft behind Sun * Mar 30 Behind: Instrument power on * Apr 25 Behind: HGA on 1st side lobe * Jul DAWN - End of nominal mission * Jul 8 Behind: HGA on 2nd side lobe * Jul 7-28 Ahead: S/C SSR Playback at 3 kbps * Jul 14 Ahead: Instrument power on * Sep 24 Ahead: HGA on 1st side lobe * Nov 20 Behind: HGA on 1st side lobe * Dec 29 Ahead: HGA on main lobe, offpoint 1 degree Ahead: SSR playback and reconfiguration, S/C checkout * Dec 31 Ahead: Instrument recommissioning 2016: * Jan 2 Behind: HGA on main lobe Behind: SSR playback and reconfiguration, S/C checkout * Jan 5 Behind: Instrument recommissioning * Jan 27 Both: HGA calibration * Feb 19 Ahead: HGA on main lobe * Mar 16 Both: Post Solar Conjunction Assessment Review * Jul 5 Juno arrival at Jupiter 2017: * Jul 11 Ahead: Switch downlink rate to 160 kbps * Jul 22 Behind: Switch downlink rate to 160 kbps 2018: * Mar 5 Ahead: Mercury transit