STEREO Weekly Meeting Minutes for 2013-04-09 (Week 15) ANNOUNCEMENTS ------------- * None. INSTRUMENT and SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 14 (Apr 1-7) * On day 091 (Apr 1), during the DSS-63 support for Ahead, turbo decoder lock was lost intermittently beginning at 1353z through 1354z. This anomaly resulted in the loss of 2320 frames of SSR data. See DR #N108705 for more information. * On day 091 (Apr 1), during the DSS-26 support for Ahead, turbo decoder lock was lost briefly at 1521z. This anomaly resulted in the loss of one frame of SSR data. See DR #N108706 for more information. * On day 094 (Apr 4), during the DSS-45 support for Ahead, turbo decoder lock was lost briefly at 2004z. This anomaly resulted in the loss of one frame of SSR data. See DR #N108717 for more information. * On day 095 (Apr 5), during the DSS-63 support for Behind, turbo decoder lock was lost briefly at 0810z. This anomaly resulted in the loss of one frame of SSR data. See DR #N108713 for more information. * On day 096 (Apr 6), during the DSS-63 support for Behind, commanding was delayed by thirty-one minutes until 0824z due to the lack of monitor data from the station. This anomaly was due to a Remote Partner Gateway (RPG) router configuration change. See DR #N108725 more information. * On day 096 (Apr 6), during the DSS-15 support for Behind, commanding was delayed by thirty-one minutes until 2038z due to the lack of monitor data from the station. The monitor data was back online in the MOC at 097-0127z. This anomaly was due to a Remote Partner Gateway (RPG) router configuration change. See DR #N108729 more information. * On day 096 (Apr 6), during the DSS-65 support for Ahead, commanding was delayed by thirty minutes until 0647z due to the lack of monitor data from the station. This anomaly was due to a Remote Partner Gateway (RPG) router configuration change. See DR #N108724 more information. * On day 096 (Apr 6), during the DSS-14 support for Ahead, commanding was delayed by thirty minutes until 1402z due to the lack of monitor data from the station. This anomaly was due to a Remote Partner Gateway (RPG) router configuration change.See DR #N108726 more information. * On day 092 (Apr 2), the Ahead spacecraft began the operational broadcast of the turbo encoded space weather telemetry at 1644z. * The average daily SSR playback volume during the week was 4.5 gigabits for Ahead, and 4.5 gigabits for Behind. Week 15 (Apr 8-14) * Ahead has 9 tracks during the week, and overall coverage is nominal. 70 meter tracks are scheduled for Tuesday, Apr 9 (D63 at 720 kbps), and Friday, Apr 12 (D14 at 720 kbps). The station 34 pass on Wednesday, Apr 10, and the station 24 pass on Saturday, Apr 13, will both be carried out at 240 kbps. The station 26 pass on Sunday, Apr 14, will be carried out at 360 kbps. An ESA New Norcia track is scheduled for Monday, Apr 8. * Behind has 14 tracks during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, Apr 8 (D14 at 720 kbps), and Friday, Apr 12 (D14). The station 26 pass on Saturday, Apr 13, will be carried out at 240 kbps. The following passes will be carried out at 160 kbps: Wednesday, Apr 10 (D26, D55), Thursday, Apr 11 (D26, D55), and Sunday, Apr 14 (D15). ESA New Norcia tracks are scheduled for Tuesday and Wednesday, Apr 9-10. Week 16 (Apr 15-21) * Ahead has 10 tracks during the week, and overall coverage is nominal. A 70 meter pass is scheduled for Friday, Apr 19, using station 63. The following passes will all be carried out at 240 kbps: Monday, Apr 15 (D25), Tuesday, Apr 15 (D55), Friday, Apr 19 (D26), Saturday, Apr 20 (D25), and Sunday, Apr 21 (D65, D15). * Behind has 11 tracks during the week, and overall coverage is nominal. A 70 meter pass is scheduled for Monday, Apr 15, using station 63 at 720 kbps. The station 26 pass on Friday, Apr 19, will be carried out at 240 kbps. The following passes will all be carried out at 160 kbps: Tuesday, Apr 16 (D24), Saturday, Apr 20 (D54, D15), and Sunday, Apr 21 (D54, D25). Week 17 (Apr 22-28) * The 56th momentum dump on Ahead will be carried out on Thursday, Apr 25, with ignition at 19:30 UT. * Ahead has 10 tracks during the week, and overall coverage is nominal. A 70 meter pass is scheduled for Friday, Apr 26 (D14 at 720 kbps). The station 26 pass on Thursday, Apr 25, will be carried out at 360 kbps. The following passes will be carried out at 240 kbps: Monday, Apr 22 (D26), Saturday, Apr 23 (D55), and Sunday, Apr 27 (D55). * Behind has 10 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Tuesday, Apr 23 (D14), and Wednesday, Apr 24 (D63 at 720 kbps). The station 26 pass on Sunday, Apr 28, will be carried out at 240 kbps. The following passes will be carried out at 160 kbps: Tuesday, Apr 23 (D15), Thursday, Apr 25 (D65), and Saturday, Apr 27 (D15). Week 18 (Apr 29-May 5) * The nominal telemetry rate for the Ahead spacecraft with the 34 meter stations will be switched to 120 kbps on day 125 (May 5). * Ahead has 10 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, Apr 29 (D14 at 720 kbps), Tuesday, Apr 30 (D14 at 720 kbps), Thursday, May 2 (D63), and Saturday, May 4 (D14 at 720 kbps). The station 26 pass on Friday, May 3, will be carried out at 240 kbps, and the station 55 pass on Saturday, May 4, will be carried out at 160 kbps. * Behind has 11 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, Apr 29 (D14), Tuesday, Apr 30 (D14 at 720 kbps), Friday, May 3 (D63), and Saturday, May 4 (D14 at 720 kbps). The following passes will be carried out at 160 kbps: Monday, Apr 29 (D26), Thursday, May 2 (D65), Friday, May 3 (D26), and Saturday, May 4 (D55). Station ids will be changing - station 32 to 74 and station 62 to 83 Week 19 (May 6-12) * Ahead has 11 passes during the week, and overall coverage is short 4.75 hours, mainly on Thursday, May 9. However, an ESA pass has been recently added for Thursday, which should alleviate this shortage. 70 meter passes are scheduled for Monday, May 6 (D14), Tuesday, May 7 (D14 at 720 kbps), and Friday, May 10 (D14). The following passes will be carried out at 160 kbps: Wednesday, May 8 (D25), Thursday, May 9 (D55), and Sunday, May 12 (D55, D26). * Behind has 10 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Thursday, May 9 (D63 at 720 kbps), Friday, May 10 (D14 at 720 kbps), and Sunday, May 12 (D14 at 720 kbps). The station 25 pass on Thursday, May 9, will be carried out at 160 kbps, and the station 26 pass on Saturday, May 11, will be carried out at 240 kbps. Week 20 (May 13-19) * Ahead has 10 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, May 13 (D14), Wednesday, May 15 (D63), Friday, May 17 (D63), and Saturday, May 18 (D63). * Behind has 8 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Tuesday, May 14 (D14), Thursday, May 16 (D63), and Saturday, May 18 (D63 at 720 kbps). The following passes will be carried out at 160 kbps: Friday, May 17 (D25), and Sunday, May 19 (D54). Week 21 (May 20-26) * Ahead has 13 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Tuesday, May 21 (D63), Friday, May 24 (D63 at 720 kbps), and Sunday, May 26 (D14 at 720 kbps). The following passes will be carried out at 160 kbps: Monday, May 20 (D54), Tuesday, May 21 (D26), and Saturday, May 25 (D26, D54). * Behind has 10 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Friday, May 24 (D63 at 720 kbps), and Sunday, May 26 (D14 at 720 kbps). The following passes will be carried out at 160 kbps: Wednesday, May 22 (D65), and Saturday, May 25 (D26). Week 22 (May 27- June 2) * Thursday, May 30 is the 57th Ahead momentum dump at 16:30z. * Wednesday, May 29 is return to service for D43. There will be no SSR playback or MOC support. * Ahead has 9 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, May 27 (D14), Tuesday, May 28 (D63 at 720 kbps), Wednesday, May 29 (D63), Friday, May 31 (D63), and Sunday, June 2 (D14 at 720 kbps). The following passes will be carried out at 160 kbps: Saturday, June 1 (D54). * Behind has 7 passes during the week, and overall coverage is nominal. 70 meter passes are scheduled for Monday, May 27 (D14 at 720 kbps), Tuesday, May 28 (D63 at 720 kbps), Friday, May 31 (D63 at 720 kbps), and Saturday, June 1 (D26 at 240 kbps). The following passes will be carried out at 720 kbps: Sunday, June 2 (D14). Other * A group has been set up with STEREO and other missions to look into the RLG gyro issue. * A person has been identified to look into the Turbo decoder lock issue. COORDINATED OBSERVATIONS ------------------------------------------------------------------------------- Scheduled activities for Week 14: M Apr 01 (091) T Apr 02 (092) Both: Switch to turbo encoding for beacon telemetry W Apr 03 (093) T Apr 04 (094) Ahead: Return-to-service track for station 54. F Apr 05 (095) S Apr 06 (096) S Apr 07 (097) Notes: * Significant telemetry shortfalls for the Ahead spacecraft are expected during the week ------------------------------------------------------------------------------- Scheduled activities for Week 15: M Apr 08 (098) T Apr 09 (099) W Apr 10 (100) T Apr 11 (101) F Apr 12 (102) S Apr 13 (103) S Apr 14 (104) ------------------------------------------------------------------------------- Scheduled activities for Week 16: M Apr 15 (105) T Apr 16 (106) W Apr 17 (107) T Apr 18 (108) F Apr 19 (109) S Apr 20 (110) S Apr 21 (111) Notes: * Passage of Comet Lemmon through HI2-A, Apr 17-May 17 ------------------------------------------------------------------------------- Scheduled activities for Week 17: M Apr 22 (112) T Apr 23 (113) W Apr 24 (114) T Apr 25 (115) Ahead: Momentum dump, 19:30 UT F Apr 26 (116) S Apr 27 (117) S Apr 28 (118) Notes: * Passage of Comet Lemmon through HI2-A, Apr 17-May 17 ------------------------------------------------------------------------------- Scheduled activities for Week 18: M Apr 29 (119) T Apr 30 (120) W May 01 (121) T May 02 (122) F May 03 (123) S May 04 (124) Ahead: Switch downlink rate to 120 kbps S May 05 (125) Notes: * Passage of Comet Lemmon through HI2-A, Apr 17-May 17 ------------------------------------------------------------------------------- Scheduled activities for Week 19: M May 06 (126) T May 07 (127) W May 08 (128) T May 09 (129) F May 10 (130) S May 11 (131) S May 12 (132) Notes: * Passage of Comet Lemmon through HI2-A, Apr 17-May 17 ------------------------------------------------------------------------------- Scheduled activities for Week 20: M May 13 (133) T May 14 (134) W May 15 (135) T May 16 (136) F May 17 (137) S May 18 (138) S May 19 (139) Notes: * Passage of Comet Lemmon through HI2-A, Apr 17-May 17 ------------------------------------------------------------------------------- Scheduled activities for Week 21: M May 20 (140) T May 21 (141) W May 22 (142) T May 23 (143) F May 24 (144) S May 25 (145) S May 26 (146) ------------------------------------------------------------------------------- Scheduled activities for Week 21: M May 27 (147) Memorial Day - APL off T May 28 (148) W May 29 (149) D43 return to service. No SSR playback or MOC support. T May 30 (150) AHEAD: 57th momentum dump at 16:30z F May 31 (151) S Jun 01 (152) S Jun 02 (153) ------------------------------------------------------------------------------- Upcoming events: 2013: * Nov 28 Both: Perihelion passage of Comet ISON http://stereo-ssc.nascom.nasa.gov/comet_ison/ * Dec 12 Ahead: Mercury transit 2014: * Jan 20 Behind: End use of 480 kbps on 70 m DSN subnet * Apr 21 Behind: Resume use of 480 kbps on 70 m DSN subnet * Apr 29 Behind: Mercury transit * Sep 07-Nov 15 Behind: Passage of Comet Siding Spring through HI2-B * Oct 15 Behind: End use of 480 kbps on 70 m DSN subnet * Oct 17 Behind: Comet Siding Spring encounter with Mars 2015: * Feb DAWN - Ceres arrival * Jan 20 - Mar 28 (TBC) Behind: Spacecraft behind Sun * Mar 17 - Jul 14 (TBC) Ahead: Spacecraft behind Sun * Jul 2 Behind: Resume use of 480 kbps on 70 m DSN subnet * Aug 25 - Oct 19 (TBC) Behind: Spacecraft behind Sun * Sep 25 Behind: End use of 480 kbps on 70 m DSN subnet * Jul DAWN - End of nominal mission 2016: * Apr 3 Behind: Resume use of 480 kbps on 70 m DSN subnet * Jul Juno arrival at Jupiter 2017: * Jul 11 Ahead: Switch downlink rate to 160 kbps * Jul 22 Behind: Switch downlink rate to 160 kbps 2018: * Mar 5 Ahead: Mercury transit