STEREO Weekly Meeting Minutes for 2012-04-03 (Week 14) ANNOUNCEMENTS ------------- * None. INSTRUMENT and SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 13 (Mar 26-Apr 1) * On day 086 (Mar 26), during the DSS-54 support for Ahead, turbo decoder lock was lost briefly at 0744z. This anomaly resulted in the loss of one frame of SSR data. See DR# N107999 for more information. * On day 087 (Mar 27), during the DSS-25 support for Ahead, real-time telemetry data was lost starting at 1816z. Telemetry was received again at 1820z when the DSN ground related anomaly was cleared. This anomaly resulted in the loss of four minutes of real-time data. All SSR data were subsequently received. See DR# N108003 for more information. * On day 088 (Mar 28), during the DSS-26 support for Ahead, turbo decoder lock was lost briefly at 1428z. This anomaly resulted in the loss of one frame of SSR data. See DR# N108004 for more information. * On day 088 (Mar 28), for the DSS-14 return to service support for Ahead, AOS was delayed 32 minutes due to a mis-configuration of the pointing model. Telemetry lock was established at 1907z and the SSR pointers were repositioned. While all SSR data was received from this support, on day 090 (Mar 30) this anomaly resulted in the loss of the SSR data listed below. See DR# G112482 and G112483 for more information. IMPACT reached 95% full: 2 minutes beginning at 090-1526z SECCHI SSR1 reached 100% full: 0.7 hours beginning at 090-1434z SWAVES reached 100% full: 1.0 hour beginning at 090-1416z * On day 091 (Mar 31), during the DSS-34 support for Ahead, turbo decoder lock was lost briefly at 2127z. This anomaly resulted in the loss of two frames of SSR data. A DR has been requested. * On day 091 (Mar 31), during the DSS-63 support for Behind, turbo decoder lock was lost intermittently beginning at 1120z through 1324z. This anomaly resulted in the loss of five frames of SSR data. A DR has been requested. * The average daily SSR playback volume during the week was 4.6 gigabits for Ahead, and 5.0 gigabits for Behind. Week 14 (Apr 2-8) * The 21st SECCHI stepped calibration roll for Ahead (at perihelion) took place this morning (Apr 3), starting at 14:45 UT. The actual date of perihelion is Friday, Apr 6. * There is a shadow track for Ahead on Friday, Apr 6, with station 26. The operational track is station 14, and the pass will be carried out at 480 kbps. It may be possible for station 26 to lock on at that rate. * Sunday, Apr 8, is Easter. Many people at APL will be off that weekend, including the preceeding Friday, Apr 6, so the instrument teams should give advance notice of any needed realtime commanding. * Ahead has 70 meter tracks on Tuesday, Apr 3 (D43), Wednesday, Apr 4 (D43), Friday, Apr 6 (D14), and Sunday, Apr 8 (D63, D14 at 720 kbps). There are 12 tracks total and overall coverage is nominal. The station 45 track on Monday, Apr 2, was carried out at 240 kbps. * Behind has 70 meter tracks on Monday, Apr 2 (D63 at 720 kbps), Tuesday, Apr 3 (D14), Thursday, Apr 5 (D63 at 720 kbps), and Friday, Apr 6 (D63 at 720 kbps). There are 10 tracks during the week and overall coverage is nominal. The station 55 pass on Tuesday, Apr 3, the station 54 pass on Wednesday, Apr 4, and the station 15 pass on Sunday, Apr 8, will all be carried out at 240 kbps. Week 15 (Apr 9-15) * The 40th momentum dump for Behind is scheduled for Wednesday, Apr 11, starting at 15:00 UT. * Ahead has 70 meter tracks on Monday, Apr 9 (D14), Tuesday, Apr 10 (D63), Wednesday, Apr 11 (D63), Friday, Apr 13 (D14), Saturday, Apr 14 (D14), and Sunday, Apr 15 (D14). There are 8 tracks during the week, and overall coverage is nominal. * Behind has 70 meter tracks on Monday, Apr 9 (D63), Wednesday, Apr 11 (D63), Thursday, Apr 12 (D63), Friday, Apr 13 (D63), Saturday, Apr 14 (D63), and Sunday, Apr 15 (D14), all at 720 kbps. There are 8 tracks during the week, and overall coverage is nominal. Week 16 (Apr 16-22) * The 46th momentum dump on Ahead is scheduled for Apr 17, with ignitition at 16:00 UT. * Station 26 has shadow tracks with operational tracks on both spacecraft on Monday, Apr 16, and on Behind on Tuesday, Apr 17. * Ahead has 70 meter tracks on Wednesday, Apr 18 (D14), Friday, Apr 20 (D63), Saturday, Apr 21 (D63), and Sunday, Apr 22 (D14). There are 10 tracks during the week, and overall coverage is nominal. ESA Cebreros passes are scheduled for Thursday, Apr 19, and Saturday, Apr 21. * Behind has 70 meter tracks on Monday, Apr 16 (D63), Wednesday, Apr 18 (D14 at 720 kbps), and Sunday, Apr 22 (D14 at 720 kbsp). There are 12 tracks during the week, and overall coverage is nominal. The station 25 pass on Saturday, Apr 21, and the station 65 pass on Sunday, Apr 22, will be carried out at 240 kbps. Week 17 (Apr 23-29) * There is a 2.75 hour return-to-service track for station 26 on Ahead on Monday, Apr 23. This track will not be shadowed, and there will be no SSR playback. * A Project Interface Test (PIT) is currently scheduled for Thursday, Apr 26, from 15-16 UT, although there is some possibility that this test will be rescheduled. Older data will be flowing during this test. * Ahead has 70 meter tracks on Monday, Apr 23 (D14), Tuesday, Apr 24 (D14, D43), Wednesday, Apr 25 (D63), Thursday, Apr 26 (D63 at 720 kbps), Friday, Apr 27 (D63), Saturday, Apr 28 (D63), and Sunday, Apr 29 (D63). There are 10 tracks during the week, and overall coverage is nominal. * Behind has 70 meter tracks on Monday, Apr 23 (D63), Tuesday, Apr 24 (D14 at 720 kbps), Wednesday, Apr 25 (D14 at 720 kbsp), Thursday, Apr 26 (D14 at 720 kbps), Friday, Apr 27 (D63 at 720 kbps), Saturday, Apr 28 (D14), and Sunday, Apr 29 (D63 at 720 kbps). There are 8 passes during the week, and overall coverage is nominal. Week 18 (Apr 30-May 6) * The ability to downlink from Ahead with 34 meter stations through the low-gain antenna will end on Monday, Apr 30. The same happened on Behind last fall. * Ahead has 70 meter tracks on Monday, Apr 30 (D14 at 720 kbps), Thursday, May 3 (D14), and Saturday, May 5 (D63 at 720 kbps). There are 11 passes during the week, and the overall coverage is nominal. The station 24 pass on Tuesday, May 1, will be carried out at 240 kbps. An ESA Cebreros pass is scheduled for Friday, May 4. * Behind has 70 meter passes on Tuesday, May 1 (D63 at 720), Wednesday, May 2 (D63, D14 at 720 kbps), Thursday, May 3 (D63), and Saturday, May 5 (D63 at 720 kbps). There are 10 passes during the week, and overall coverage is nominal. The station 55 pass on Monday, Apr 30, and the station 54 passes on Friday, May 4, and Sunday, May 6, will all be carried out at 240 kbps. Passes with the ESA New Norcia station are scheduled for Monday, Apr 30, and Friday, May 4. Week 19 (May 7-13) * Ahead has 70 meter passes on Monday, May 7 (D63 and D14), Wednesday, May 9 (D63), Friday, May 11 (D14 at 720 kbps), and Sunday, May 13 (D14 at 720 kbps). There are 11 passes during the week, and overall coverage is nominal. The station 54 passes on Tuesday, May 8 and Thursday, May 10, and the station 26 pass on Thursday, May 10 will be carried out at 240 kbps. * Behind has 70 meter passes on Monday, May 7 (D63 at 720 kbps), Tuesday, May 8 (D63 at 720 kbps), Thursday, May 10 (D14), Friday, May 11 (D63), and Sunday, May 13 (D63). There are 10 passes during the week, and overall coverage is nominal. The station 55 passes on Wednesday, May 9 and Saturday, May 12, the station 25 pass on Saturday, May 12, and the station 24 pass on Sunday, May 13, will all be carried out at 240 kbps. Other * There is a space weather campaign currently in effect, from Mar 29 to Apr 30, with the name SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), tracking the return of NOAA 11429. Only synoptic data from STEREO is requested, though they are also interested in data analysis, and in particular space weather predictions. More information can be found at http://solar.physics.montana.edu/hypermail/mmscience/0856.html COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 14: M Apr 02 (093) T Apr 03 (094) Ahead: SECCHI stepped calibration roll, 14:45 UT W Apr 04 (095) T Apr 05 (096) F Apr 06 (097) Ahead: Perihelion S Apr 07 (098) S Apr 08 (099) Easter Note: * SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), March 29 - April 30, tracking return of NOAA 11429. http://solar.physics.montana.edu/hypermail/mmscience/0856.html ------------------------------------------------------------------------------- Scheduled activities for Week 15: M Apr 09 (100) T Apr 10 (101) W Apr 11 (102) Behind: Momentum dump, 15:00 UT T Apr 12 (103) F Apr 13 (104) S Apr 14 (105) S Apr 15 (106) Note: * SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), March 29 - April 30, tracking return of NOAA 11429. http://solar.physics.montana.edu/hypermail/mmscience/0856.html ------------------------------------------------------------------------------- Scheduled activities for Week 16: M Apr 16 (107) T Apr 17 (108) Ahead: Momentum dump, 16:00 UT W Apr 18 (109) T Apr 19 (110) F Apr 20 (111) S Apr 21 (112) S Apr 22 (113) Note: * SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), March 29 - April 30, tracking return of NOAA 11429. http://solar.physics.montana.edu/hypermail/mmscience/0856.html ------------------------------------------------------------------------------- Scheduled activities for Week 17: M Apr 23 (114) Ahead: Return-to-service track for station 26. T Apr 24 (115) W Apr 25 (116) T Apr 26 (117) Behind: PIT test, 15-16 UT. F Apr 27 (118) S Apr 28 (119) S Apr 29 (120) Note: * SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), March 29 - April 30, tracking return of NOAA 11429. http://solar.physics.montana.edu/hypermail/mmscience/0856.html * Old data will be flowing during the PIT test. ------------------------------------------------------------------------------- Scheduled activities for Week 18: M Apr 30 (121) Ahead: End downlink with LGA on 34 meter stations T May 01 (122) W May 02 (123) T May 03 (124) F May 04 (125) S May 05 (126) S May 06 (127) Note: * SCOSTEP Observing and Modeling Campaign On Space Weather Events (SOMCOSE), March 29 - April 30, tracking return of NOAA 11429. http://solar.physics.montana.edu/hypermail/mmscience/0856.html ------------------------------------------------------------------------------- Scheduled activities for Week 19: M May 07 (128) T May 08 (129) W May 09 (130) T May 10 (131) F May 11 (132) S May 12 (133) S May 13 (134) ------------------------------------------------------------------------------- Upcoming events: 2012: * Jul DAWN - Vesta departure * Jul 11 Both: HGA calibration * Nov 4 Behind: Switch downlink rate to 120 kbps * Nov 13 Total solar eclipse, south Pacific 2013: * May 3 Ahead: Switch downlink rate to 120 kbps * Dec 12 Ahead: Mercury transit 2014: * Jan 20 Behind: End use of 480 kbps on 70 m DSN subnet * Apr 21 Behind: Resume use of 480 kbps on 70 m DSN subnet * Apr 29 Behind: Mercury transit * Oct 15 Behind: End use of 480 kbps on 70 m DSN subnet 2015: * Feb DAWN - Ceres arrival * Jan 20 - Mar 28 (TBC) Behind: Spacecraft behind Sun * Mar 17 - Jul 14 (TBC) Ahead: Spacecraft behind Sun * Jul 2 Behind: Resume use of 480 kbps on 70 m DSN subnet * Aug 25 - Oct 19 (TBC) Behind: Spacecraft behind Sun * Sep 25 Behind: End use of 480 kbps on 70 m DSN subnet * Jul DAWN - End of nominal mission 2016: * Apr 3 Behind: Resume use of 480 kbps on 70 m DSN subnet 2017: * Jul 11 Ahead: Switch downlink rate to 160 kbps * Jul 22 Behind: Switch downlink rate to 160 kbps 2018: * Mar 5 Ahead: Mercury transit