STEREO Weekly Meeting Minutes for 2007-12-18 (Week 51) ANNOUNCEMENTS ------------- * The Dec. 25 operations telecon has been canceled. * The Jan. 1 telecon is rescheduled to Jan. 2, at the ordinary time. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spececraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 50 * The average daily downlink was 7.4 gigabits on Ahead and 7.0 gigabits on Behind. * The latest G&C parameters were loaded into EEPROM on day 347 (Dec 13) on Ahead, and day 348 (Dec 14) on Behind. * On day 347 (Dec 13), station 55 at Madrid was unable to lock on to Behind, and the pass was switched temporarily to station 63. About an hour and 15 minutes after the start of the pass station 55 was able to lock on, and took over the pass. This resulted in a loss of 3 hours and 10 minutes of SECCHI data. Week 51 * There will be a momentum dump on Ahead on day 354 (Dec 20) at 14:00 UT. This will be the 10th momentum dump on Ahead. Week 52 * Nothing unusual planned. Week 1, 2008 * There will be a SECCHI stepped calibration roll on Ahead on January 3, starting at 07:10 UT. The SECCHI team needs a detailed timeline for the roll--APL will send this to them. There are 5 minutes to perform each roll and settle, plus a 15 minute dwell at each position. The script is being modified to disable GT use during spacecraft slews, and then reenable GT use during the dwell periods. * Orbital aphelion on Ahead will occur on January 6. Week 2 * The second SECCHI campaign starts on January 7. There will be two tracks per day, approximately 12 hours apart. The second track will be bring down only SECCHI data. A second track for Behind has been added for day 7, the schedule for Ahead is still being worked on. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 51: M Dec 17 (351) T Dec 18 (352) W Dec 19 (353) T Dec 20 (354) Ahead: Momentum dump 14:00 UT F Dec 21 (355) S Dec 22 (356) S Dec 23 (357) ------------------------------------------------------------------------------- Scheduled activities for Week 52: M Dec 24 (358) T Dec 25 (359) W Dec 26 (360) T Dec 27 (361) F Dec 28 (362) S Dec 29 (363) S Dec 30 (364) ------------------------------------------------------------------------------- Scheduled activities for Week 01: M Dec 31 (365) T Jan 01 (001) W Jan 02 (002) T Jan 03 (003) Ahead: SECCHI Stepped Calibration Roll, 07:10 UT F Jan 04 (004) S Jan 05 (005) S Jan 06 (006) ------------------------------------------------------------------------------- Scheduled activities for Week 02: M Jan 07 (007) Start of second SECCHI campaign T Jan 08 (008) W Jan 09 (009) T Jan 10 (010) F Jan 11 (011) S Jan 12 (012) S Jan 13 (013) Notes: * Jan 7-20 SECCHI campaign ------------------------------------------------------------------------------- Upcoming events: SECCHI Stepped calibration rolls Ahead: Jan 3, Apr 1, Jun 24, Sep 23, Dec 16 Behind: Feb 19, May 20, Aug 26, Dec 2 * Dec 2007-May 2008 Ulysses quadrature http://stereo-ssc.nascom.nasa.gov/plans/UlyLocation2006-2014_v1.pdf * Jan 7-20 SECCHI campaign * Jan 14 Messenger - Mercury fly-by * Mar 20 - Apr 16 Whole Heliosphere Interval http://ihy2007.org/WHI/targeted_plans.shtml * Apr 10-16 JOP 204, Energetics and dynamics of the quiet Sun * Apr 21 - May 16 SUMER campaign * Oct 6 Messenger - Mercury fly-by