STEREO Weekly Meeting Minutes for 2006-07-11 (Week 28) ANNOUNCEMENTS ------------- * STEREO Weekly Planning meeting/telecon occurs every Tuesday effective 7/11/2006 from 12:30 PM to 1:30 PM Eastern Time (US & Canada). Where: STEREO MOC Conference Room, Mod6. INSTRUMENT STATUS ----------------- N/A OPERATIONS CONSTRAINTS ---------------------- * No instrument data will be downloaded from the SSR during 1st week. * Front End IDs depend on DSN station. 8. Goldstone 9. Madrid 10. Canberra * Discussion of new early operations schedule, 8-Jul-2006. Instrument teams need to comment on the first week of this schedule by Friday, and on the rest of the schedule by launch. Note that some instrument events were not moved but need to be moved. These events are out of time sequence. Please provide a day offset to a maneuver for these events. * The baseline plan is still to turn instruments off for maneuvers. Instruments will be powered off during the track before a maneuver and powered on again during the succeeding track after the maneuver. If the backup maneuver is needed, instruments will remain off. There may be a possibility of keeping some instruments powered on during a maneuver. * Discussion of operational requests from instrument teams, reproduced below. Item Status * SECCHI Survival Power Usage Accepted * SECCHI GT/G&C commissioning Under discussion * IMPACT/MAG calibration roll changes Accepted * Beacon convolutional encoding Accepted * SWAVES calibration roll Submitted * SECCHI COR calibration roll Accepted * SECCHI EUVI off-point Needs definition * SECCHI campaign dates Submitted to DSN * IMPACT 45 degrees off-point Rejected * SECCHI HI roll/off-point Unsubmitted * GT/G&C commissioning is still under discussion. Although activities appear in the plan regarding the GT, these entries are placeholders. * The SWAVES and COR (stepped) calibration rolls need to be run through the HIL simulator. * The SECCHI EUVI and HI calibration activities are awaiting definition. * The dates of the SECCHI campaign will change if launch slips to the next launch window. NRL has already provided a memo outlining how the dates will change. COORDINATED OBSERVATIONS ------------------------ M Jul 31 (W31) T Aug 01 Launch W Aug 02 Power on SECCHI, move doors from superclosed to closed Power on SWAVES, deploy antennas T Aug 03 1st Engineering Burn Power on IMPACT IDPU, SWEA, Deploy SWEA cover Power on PLASTIC F Aug 04 Power on IMPACT/SWEA HVPS S Aug 05 S Aug 06 A1 Prime Delta V Maneuver